Zephyr COK-E36SX, COK-E42SX, COK-E48SX manual Ins ta lla tion - M ounting Hood, B C A

Models: COK-E48SX COK-E42SX COK-E36SX

1 23
Download 23 pages 55.72 Kb
Page 15
Image 15
B

Top

gap between bracket and wall

B

C

A

Bottom

Attach screws to both sides of the duct covers and secure to ceilingbracket.

10”

Electrical

1.Place wall bracket on line C. Position top of wall bracket so it is even with the 21” mounting spread. Make

sure bracket is attached to wall as shown in the diagram. The top of the wall bracket should have a gap between it and the wall. The bottom should be flush against the wall. Use (3) 2” wood screws to attach bracket to wall. Use anchors if not mountingto studs.

2.Lift hood onto wall bracket, there is a lip on the back of the hood which will rest on the wall bracket. Secure in place by *screwing (2) screws with washers through hood into the wall. There are two holes at the bottom inside the hood in which to do this.

3.Place telescopic duct covers on top of hood and extend top duct cover to the ceiling bracket. Attach duct cover to ceiling bracket with the providedscrews.

4.Run duct work down to top of motor. Attach electrical wiring from ceiling to wiring on top of motor housing. (slide

duct cover up towards ceiling to gain access to the motor housing)

*Note: If installing onto drywall only with no wall studs present, attach E Z anchors (not provided) into the wall. Please see page 15 for external blower installation instructions.

Ins ta lla tion - M ounting Hood

13

Page 15
Image 15
Zephyr COK-E36SX, COK-E42SX, COK-E48SX manual Ins ta lla tion - M ounting Hood, B C A