FIG. B

Ceiling Joists Installation – Mounting the Hood

Wood Blocking

1

 

Front

3

Top Support Frame

 

2

Bottom Support Frame FIG. A

Manual background 5

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background 6

Hood/Canopy Manual background

Top Support Frame

front

side

Bottom Support Frame

back

2. Key hole

1. Wider cut out

4

front

FIG. B

FIG. C

Installation – Mounting the Hood

FIG. A

Manual background!Manual background CAUTION: At least two installers are required due to the weight and size of the hood.

1.*Determine desired mounting location on ceiling and add wood blocking (min. 2” x 4”) onto ceiling joists. (FIG. A, #1)

2.Remove screws securing top and bottom support frame together. Adjust support frame to accomodate the desired height and re-assemble using the previously removed screws (2 for each support frame arm). (FIG. A, #2)

3.Fasten top support frame to desired location on ceiling using (4) M4 x 1-1/2” wood screws with washers. (FIG. A, #3) The top support frame should be positioned so the narrow side is facing front to back. FIG. B. Make sure to install the bottom support frame with the wider cut-out section facing the front of the hood. (FIG. C, #1)

4.Remove the (2) metal mesh filters and the (2) black charcoal filter brackets located behind the metal mesh filters. Each bracket is secured to the hood with (4) Philips head screws. (Note: If hood is used in ducted mode the charcoal brackets may be discarded.) Place canopy over blower housing on top of hood and secure to hood body using (4) 3/16” x 8 screws. (FIG D, page 10)

5.Lift hood and align the (4) pre-installed mounting screws on top of hood (FIG. A, #5-6) with the (4) key holes on bottom of support frame. (FIG. C, #2) Slide hood towards the narrow end of key holes to lock into place. Hand tighten each of the (4) screws to secure hood to bottom of support frame.

6.Reinstall the (2) charcoal filter brackets (if recirculating) and metal mesh filters.

*Hood is intended to be mounted to a finished ceiling.

9

Page 11
Image 11
Zephyr ZML-E42AG/AS, ZML-M90AG/AS manual Installation - Mounting the Hood, Fig. B Fig. C, Fig. A