Installation – Mounting the Hood
canopy
(Bottom of the hood)
screw holes (4) for the canopy
FIG. D
cut-down
Top support frame 10
13 Thick trim piece
Top duct covers | 9 | |
|
|
12
Bottom duct covers | 11 | Thin trim piece |
Bottom support frame
FIG. E
7.Install electrical and duct work. Seal duct work with aluminum duct tape.
8.Power up hood and check for leaks around duct tape.
9.*Assemble top duct covers (with louver holes) together using (2) M3 x 6 screws. (FIG. E, #9). Larger screw hole openings should overlap the smaller holes.
10.Secure top duct covers to top support frame using (2) M4 x 8 screws. (FIG. E, #10). Note: If using hood in “ducted mode” the top duct covers may be turned
11.Assemble bottom duct covers together over top duct covers using the final (4) M3 x 6 screws. Bottom duct covers should rest on top of the hood body. (FIG. E, #11)
12.Insert the (2) thin trim pieces into left and right seams of bottom duct covers. (1 on each side) (FIG. E, #12)
13.Insert the (2) thick trim pieces into left and right seams of top duct covers. (1 on each side)
Note: Because less of the top duct covers will be exposed, it may not be necessary to measure and cut the thick trim pieces with a hack saw before installing them into the top duct covers.
*If using hood in recirculating mode you must install the air diverter plate before assembling the duct covers. Turn to page 11 for instructions.
! WARNING: Electrical wiring must be done by a qualified person(s) in accordance with all applicable codes and standards. This range hood must be properly grounded. Turn off electrical power at service entrance before wiring.
10