Installation – Mounting the Hood

Add Blockings Manual background

Fasten upper duct cover

Install Duct Cover

Adjust height & fasten frame

Fasten Support Frame

1.Add and secure blocking (minimum 2x4 studs onto ceiling joists.

2.Fasten mounting telescopic support frame directly onto ceiling joist or stud blockings.

3.Adjust height requirement and fasten support frames together. NOTE: If recirculating the hood, install air diverter plate onto support frame.

4.Slide upper and lower telescopic duct duct covers onto support frame. Fasten upper duct cover piece to frame.

5.Install duct work and electrical

Installation – Mounting the Hood

Manual background ! Manual background CAUTION: At least two installers are required due to the weight and size of the hood.

9

Page 11
Image 11
Zephyr ZNA-M90S, ZNA-E42S manual Installation - Mounting the Hood