Dimension
Chapter 2
Hardware Description and Installation
This section shows two switch installations, describes the switch hardware and gives a functional overview of the switch.
The switch is suited to an office environment where it can be rack mounted on standard EIA racks or as a standalone.
For proper ventilation, allow at least 4 inches (10 cm) of clearance at the front, 3.4 inches (8 cm) at the back of the switch. This is especially important for enclosed rack installations.
2.1Desktop Installation
Step 1. Set the switch
Step 2. Make sure there is enough clearance around the switch to allow air circulation and the attachment of cables and the power cord.
Step 3. Remove the adhesive backing from the supplied rubber feet.
Step 4. Attach the rubber feet to each corner on the bottom of the switch. These rubber feet help protect the switch from shock or vibration and ensure space between devices when stacking.
Step 5. Turn the switch