AT-iMG646xx Series Intelligent Multiservice Gateway and AT-EN646 Enclosure Installation Guide

10.Trim the wire ties close to the cables.

11.Put the cover onto the splice tray.

12.Temporarily secure the splice tray to the inside of the inner cover with electrical tape until the gateway is installed, as shown in Figure 24.

Note

In cold climates, Allied Telesis recommends that you use 3M 3723 Cold Temp Tape.

854

Figure 24. Securing the Metal Splice Tray

Note

The AT-iMG646BD-ONWAN module has a receive sensitivity of -3 dBm to -32 dBm at 1550 nm. After the fiber pigtail is installed and before you plug the pigtail into the gateway, please check the power of the optical input signal. The power at 1550 nm should fall within the receive sensitivity specification. If the power is too high, an optical attenuator is needed in the link. If the power is too low, you must trace the optical path to determine the cause of the excess loss.

Note

The AT-iMG646PX-ONWAN module has a receive sensitivity of -3 dBm to -26.5 dBm at 1490 nm. After the fiber pigtail is installed and before you plug the pigtail into the gateway, please check the power of the optical input signal. The power at 1490 nm should fall within the receive sensitivity specification. If the power is too high, an optical attenuator is needed in the link. If the power is too low, you must trace the optical path to determine the cause of the excess loss.

Section I: Outdoor Installation

47

Page 47
Image 47
Allied Telesis AT-iMG646PX-ON, AT-EN646 manual 854