ASSEMBLY
•Press lift lever plunger and raise attachment lift lever to its highest position.
•Start the engine.After engine has started, move throttle control to idle position.
•Release parking brake.
•Slowly move the motion control lever forward and slowly drive tractor off skid.
•Apply brake to stop tractor, set parking brake and place motion control lever in neutral position.
•Turn ignition key to "STOP" position.
Continue with the instructions that follow.
TO INSTALL BAGGER COMPONENTS TO TRACTOR (See Figs. 4A-4D)
•Remove discharge chute from rear of tractor. Unhook the two (2) straps and pull chute out and away from tractor.
•Remove the two (2) 3/8 nuts and fl at washers from the bolts at the tractor back plate.
DISCHARGE
CHUTE
3/8 NUT
FLATWASHER
0 2277
FIG. 4A
•Using the nuts and fl at washers removed from tractor back plate, install the bagger support tube to the back plate as shown. Tighten securely.
SUPPORT
TUBE
FLAT
WASHER
3/8 NUT
BOLT | 02330 |
|
FIG. 4B
•Install the two upper support brackets through the back plate and to the chassis, using the 10 x 19 mm (3/8"x3/4") carriage bolts and locknuts supplied.Tighten securely.
•Assemble both support brackets to the outside of the baggger support tube using two each 3/8 x 63,5mm hex bolts13/32" I.D. fl at washers and 3/8 locknuts from parts bag. Tighten securely.
•Replace discharge chute into rear opening of tractor. Secure the chute with the two hook straps.
3/8 LOCK NUT
3/8 LOCK NUT
SUPPORT BRACKET
13/32 FLAT WASHER
3/8 HEX BOLT
3/8 CARRIAGE BOLT | 02590 |
|
FIG. 4C
NOTE:The strap hook must go through the discharge chute only. Do not allow the hook to enter the slot in the tractor back plate.This will allow the discharge chute to float with the mower deck when moving on uneven terrain.
DISCHARGE
CHUTE
HOOK
02306
BACKPLATE
SLOT
FIG. 4D
TO ASSEMBLE BAGGER (See Figs. 5 & 6)
NOTE: For ease of assembly, you may wish to obtain the assistance of another person when putting the bagger together.
•Holes in front bagger tube are at an angle. Place front bagger tube against lower bagger tube and check for proper hole alignment before assembling bolts.
•Assemble front and lower bagger tubes using four (4) 1/4 x 50,8mm carriage bolts and lock nuts supplied. Tighten securely.
FRONT BAGGER TUBE | LOWER | ||
BAGGER | |||
|
| ||
|
| TUBE | |
1/4 X 2" |
|
| |
CARRIAGE | 1/4 LOCK |
| |
BOLTS | 2 | ||
0259 | |||
| NUT |
|
FIG. 5
8