Poulan 301ZX warranty Moving Machine By Hand

Page 32

OPERATION

Moving Machine By Hand

When pushing or pulling the mower, be sure to engage the EZT Hydrogear bypass linkages. The EZT bypass linkages are located on the rear of the frame, below the rear engine guard.

1.Raise the deck into the highest cutting position.

2.Pull the EZT bypass linkages out and into the slots. Release linkages to hold in the bypass position.

3.Release park brake.

4.To reengage the EZT’s to drive, reverse the above procedure.

8050-018

Set bypass linkages into slots on both sides

32

Image 32 Contents
Operator Manual All rights reserved Contents Page Introduction Good Service Manufacturing NumberSymbols and Decals Xxxx xxxxxx xxxxx xxxx Xxxxxx xxxxxxxxx. xx xxxxxxxxRemove key before General Operation SafetySafety Instructions Never take passengers Personal Safety Equipment Slope OperationKeep children away from work area Safe Handling of Gasoline General Maintenance Risk of sparking Transport Spark ArrestorControls Control LocationsSteering Control Levers Throttle Control Ignition SwitchParking Brake Choke Control Fuel TankFuel Shut Off Valve Mower Deck Lifting LeverTracking Always use the high position F to transportBlade Control Lever Bypass LinkageSteering OperationTraining Before Starting Starting the EnginePlace controls in neutral position Open the fuel valve To remove cables, reverse order Weak BatteryJumper cables Running Operating on Hills Mowing Tips Stopping the Engine Moving Machine By Hand Maintenance Maintenance Schedule100 300 Year Always use protective glasses when handling the battery BatteryCleaning battery and terminals Safety System Tire PressuresDeck Belt Deck Belt ReplacementBelts EZT Belt Cutting BladesAdjusting the Mower Deck Leveling DeckCleaning Removal and installation of caster wheelUse protective glasses when cleaning and washing Caster WheelsLubrication GeneralFront Wheel Mount Front Wheel BearingsDeck Spindle TransmissionTroubleshooting Problem CauseTroubleshooting Winter Storage ServiceStorage Schematic Standard Hardware Technical DataTorque Specifications Overall dimensions EngineTransmission EquipmentConformity Certificates USA RequirementsService Journal Delivery ServiceHour Service After 5-10 HoursPerform the 25-hour service At Least Once Each Year Service Journal
Related manuals
Manual 24 pages 51.72 Kb