Poulan Pro 925 ZX, Pro 950 ZX manual EZT belt removal

Page 46

MAINTENANCE

EZT belt

WARNING!

Before performing any service or adjustment checklist:

1.Engage the parking brake.

2.Place the Blade-switch in the disengaged position.

3.Turn ignition switch to “OFF” position and remove the key.

4.Make sure the blades and all moving parts have completely stopped.

5.Disconnect the spark plug wire from all spark plugs and place the wire where it cannot come in contact with the plug.

To replace EZT (E-Series Zeroturn

Transaxle) belt

Park the mower on a level surface. Engage the parking brake.

EZT belt removal

NOTE: Be careful not to damage the fan blades on the EZT´s as this can affect cooling or damage the EZT´s

Remove the deck belt (see to replace deck belt in this section of the manual).

Unplug clutch from wiring harness. Remove bolt from center of clutch and slide clutch off of engine shaft.

Create slack in the belt by removing the spring on the pump idler arm.

The belt should now be able to be removed from the engine pulley and EZT pulleys.

CZ-21

Belt installation

Transaxle belt

Wrap the EZT belt around the EZT pulleys

Route the belt around the inside of the idler pulley.

Now you can wrap the belt around the engine pulley.

Reattach the spring on the pump idler arm.

Install clutch on to engine shaft (pulley side down) make sure key is installed and align the clutch anti rotation tab into slot on clutch. Secure clutch, install wire.

Reinstall the deck belt onto the electric clutch belt (see to replace deck belt in this section of the manual).

English-44

Image 46
Contents Pro 925 ZX Pro 950 ZX Page Contents OPERATOR’S Manual Rider SeriesEnglish-2 Introduction IntroductionGood Service Manufacturing NumberSymbols and Decals Symbols and DecalsXxxx xxxxxx Objects Engine is Running Moving sharp blades under cover Safety Instructions Safety InstructionsGeneral Operation English-8 Personal Safety Equipment Slope OperationChildren Maintenance General Maintenance Risk of sparking Transport Important InformationCustomer responsibilities Controls ControlsControl Locations Motion Control Levers TrackingSeat adjustment knobs FusesBy pass linkages Blade switch RefuelingChoke Control Ignition SwitchThrottle Control Parking Brake Hour MeterMachine must be stopped before activating the parking brake Accessories Cutting height pedalOperation OperationTraining Before Starting Starting the EngineDepress the control for disengaging the mower deck Press in and turn the ignition key to the start position To start an engine with a weak battery To remove cables, reverse orderRunning Operating on hills Mowing Tips Stopping the Engine Moving by Hand Maintenance MaintenanceMaintenance Schedule = Described in this manual  = Not described in this manual Replacing battery BatteryTo clean battery and terminals Always use protective glasses when handling the batteryIgnition System Checking the Safety System Checking and Adjusting the Choke Cable Checking and Adjusting the Throttle CableChecking the Engines Cooling Air Intake Replacing the Air Filter Briggs and Stratton engineChecking Tire Pressures Replacing the Fuel FilterChecking the Parking Brake Checking the V-belts Deck beltDeck belt installation EZT belt EZT belt removalChecking the Blades Check the bladesAdjusting the Mower Deck Side-to-side adjustment To level deckFront-to-back adjustment To adjust anti-scalp rollers Caster Wheels Cleaning and WashingUse protective glasses when cleaning and washing HardwareLubrication LubricationLubrication Schedule Caster wheels Lubricating the CablesLubricating in Accordance with the Lubrication Schedule Engine Oil Briggs & Stratton Changing the Engine OilOil drain valve Checking the oil level Changing the Oil FilterTransmission Trouble Shooting Guide Trouble Shooting GuideProblem Cause Wrong fuel type English-58 Storage ServiceStorage Winter StorageWiring Diagrams Wiring diagramTechnical Data Technical Data925ZX 950ZX Equipment Torque Specifications Torque Specifications HEX Head CAP Screws Conformity Certificates Conformity CertificatesUSA requirements Delivery Service Service JournalService Journal Action Date, mtr reading, stamp, signAfter the First 5-8 Hours Hour Service English-69 English-70 English-71 At Least Once Each Year English-73 English-74 English-75 Page Page 113920Rir07/11/06