6.Install the blower mounting bracket to the deck using
7.Install the catch plate (p/n 423297) to the blower assembly using
8.Install the blower assembly to the mounting bracket and secure with the mounting pin. See Figure
9.Align the blower assembly with the discharge opening of the cutter deck. Tighten the hardware for the mounting bracket. Then tighten the hardware for the catch plate.
10.Install the belt to the spindle pulley. When replacing the belt, see figure below.
13.Install the hopper hood assembly onto the catcher frame assembly and secure with
14.Install the catcher support bracket onto the rear of the machine and secure with
See Figure
Catcher Support Bracket
BACK SIDE
IDLER PULLEY BLOWER PULLEY
FIGURE
FRONT SIDE | SPINDLE | |
PULLEY | ||
IDLER PULLEY | ||
|
11.Install the new belt covers and secure with the plastic wing nuts. See Page 18 of the Illustrated Parts List for proper installation.
12.Install the hopper mounting brackets
(p/n 451512) to the outside of the frame on the rear of the machine using
15.Install the heat shield to the hopper hood assembly and catcher frame assembly. Secure using the hardware specified in Figure
16.Install the catcher frame assembly onto the rear of the machine and secure with the quick pins (p/n
17.Install adapter (p/n 461419) to the blower assembly and secure with the strap.
8