Scag Power Equipment GC-STT manual Operate and test

Page 7

19.Install the hose from the blower assembly to the hopper hood. Secure using the 8-1/2" clamps.

-NOTE-

When installing this catcher on machines equipped with an air cooled engine the discharge hose should be shortened to 56" in length.

20.Install the bag assemblies.

21.Install the weight support bar to the front of the machine by resting it directly on top of the caster support arms and sliding it tight against the frame of the machine. Secure the weight bar to the machine using (2) bar clamps, (4) 3/8-16 x 1-1/2" bolts and (4) 3/8-16 elastic stop nuts. See Figure 3-6.

22.Install the weight assemblies to the weight support bar and secure them to the bar using the 1/2"x 6-1/4" pin and lanyard. See Figure 3-6.

WEIGHT (5x)

LANYARD

ELASTIC STOP PIN

NUT

BAR CLAMP

BOLT

WEIGHT SUPPORT BAR

2002 GC-STT Install Art 3-5

FIGURE 3-6

23. Operate and test.

5

Image 7
Contents OPERATOR’S Manual Remember Your Mower is only AS Safe AS the Operator Introduction Safety and Operating InstructionsDirection Reference Assembly Instructions for 52 Cutter Decks Right Side Cutter Deck Shown Back Side Idler Pulley Blower Front Side Spindle Operate and test Assembly Instructions for 61 Cutter Decks Rear Cutter Deck Discharge Chute Opening Back Side Idler Pulley Blower Pulley Front Side Spindle Weight Assembly Instructions for 72 Cutter DecksBack Side Idler Pulley Blower Right Side Cutter Deck Shown Catcher Support Bracket Liquid Cooled Only Clevis PIN Grass Catcher Removal InstructionsPage 16 15 GC-STT Blower Housing Assembly GC-STT Blower Mounting Components Part Number Description GC-STT Bucket Support Components Some of the hardware is common hardware GC-STT BAG Support Bracket and Seal 423198 GC-STT Decals Page Limited WARRANTY- Commercial Accessory Scag Power Equipment