Rubbermaid 1S84 manual Optional Step

Page 9

25

Apply Ridge Tape (HH) to Ridge Cap (GG) 2 places. Snap Ridge Cap (GG) onto the

Ridge Beam Assembly covering the seam.

26 Place the Ridge Beam Assembly into cups at the top of each Gable (M).

2

HH

GG

HH

RS

RS

GG

RL

GG

RL

M

1

2

M

27

Align slots in Ridge Beam Assembly with holes in Gable (M) tab at back, install

Bolt (BB), Washer (CC), and Nut (DD) 1 place, ONLY TIGHTEN NUT “FINGER” TIGHT.

28 OPTIONAL STEP:

Install (2) 2" x 6" x 124-1/4" pieces of lumber into Gable (M). (Lumber not included.)

Note: Highly recommended for areas of extreme snow or extreme heat. Usage of the lumber supports is optional. The Big Max Ultra Shed is designed to function properly without them; however the lumber provides extra roof support in extreme conditions.

Washer

Plastic Tab

 

on Gable

Nut

Bolt Head

DD

CC

BB

 

M

R

 

 

M

M

M

R

Image 9
Contents 1S84 Floor Plan 5H52 Back Position 5H52 Middle Position Click 124 Do not Engage the Snaps Start Do not overtighten FF FF Optional Step DD CC Channel Roof Panel Rib Gable Channel Roof Panel Gable Rib Page See Step 94.63 128.85 88.09 Congratulations