Snapper 1721303-01 manual Initial Setup & Assembly, Assemble Blade

Page 12

Initial Setup & Assembly

Figure 9. Bar Stop

A.Bar Stops

B.Taptite Screws, 5/16-18 x 1

INITIAL SETUP & ASSEMBLY

NOTE: Some of the following setup procedures may already be completed.

Assemble Blade

1.Place the blade on a flat surface.

2.Install the bar stops (A, Figure 9) using the two 5/16- 18 x 1 taptite screws (B).

3.See Figure 10. Insert threaded end of eyebolt (A) through lug on blade, and screw on 5/16 nut (B) just far enough so that it is flush with the end of the eye- bolt.

4.Hook the springs (C) into the pivot frame (D). Using a pliers, stretch the springs to hook the opposite ends to the eyebolts (A).

5.Tighten the nut (B) on each eyebolt enough to expose about 3/4" (19 mm) of thread.

6.Holding the first nut (B) with a wrench,add a second nut (E) to each eyebolt, and tighten securely against the first nut to act as a jam nut.

Figure 10. Tension Springs

 

A. Eyebolt

D. Pivot Frame

B. Nut, 5/16

E. Nut, 5/16

C. Spring

 

11

Image 12
Contents Snow Plow/Dozer Blade HitchTable of Contents Safety Rules Information General WarningsFeatures Controls Blade Angle Control LeverAttachment Lift General Operating Instructions Checks Before StartingEngine & Ground Speed Selection TransportingChanging Angle of the Blade Dozing TipsSnow Plowing Tips Daily StorageMaintenance Schedule For Normal CareLubricate Dozer Blade Adjustments Skid Shoe AdjustmentSpring Tension Adjustments Lift Rod AdjustmentInitial Setup Assembly Qty DescriptionInitial Setup & Assembly Initial Setup & Assembly Assemble BladeInstall Blade Assemble Lift RodInstall Angling Control Rod Attaching Removing Removing & Attaching Dozer BladeHardware Identification & Torque Specifications