Snapper 1721303-01 manual Install Angling Control Rod

Page 14

Install Angling Control Rod

NOTE: If installing the dozer attachment on a unit equipped with a snowcab, replace the control rod sup- port (A, Figure 13) with the hanging support (Ref. No. 19, Figure 8). Mount the hanging support to the front cab cross-bar.

1.Set the angling control support (A, Figure 13) against the right side of the frame. Insert two 5/16-18 x 1-1/2 capscrews (C) through the support (A), and frame.

Space the lower hole away from the frame with a 5/16 washer (D). Secure using flange locknuts (E).

2.Install the eyebolt (B) in the support (A) and secure with a centerlock nut.

Initial Setup & Assembly

A

B

C

D

E

3.Connect the lower angling rod (F, Figure 14) to the dozer release lever using a hair pin clip and washer

(G).

4.Insert the upper control rod (C) through the eyelet (B), and secure the eyelet to the support using a 1/4- 20 centerlock nut (A).

NOTE: It may be necessary to leave the eyebolt nut (A, Figure 14) loose to prevent binding.

5.Secure the upper rod (C) to the lower rod (F) using two 5/16-18 x 1-1/4 capscrews (D), washers (qty. 4), lockwashers, and nuts (E). NOTE: Match offset to offset so the rods form a straight line.

Figure 13. Control Rod Support

A.

Angling Support

D. 5/16 Flatwasher

B.

Eyebolt & Locknut

E. Flange Locknuts

C. 5/16-18 x 1-1/2 Capscrews

D

C

B

 

 

 

 

E

F

 

 

 

 

A

 

G

 

Figure 14. Assemble Control Rods

A.1/4-20 Centerlock Nut

B.Eyelet

C.Upper Control Rod

D.5/16-18 x 1-1/4 Capscrew

E.5/16 Washers, Lockwashers, & Nuts

F.Lower Control Rod

G.Hair Pin Clip & Washer

13

Image 14
Contents Snow Plow/Dozer Blade HitchTable of Contents Safety Rules Information General WarningsAttachment Lift Features ControlsBlade Angle Control Lever Engine & Ground Speed Selection General Operating InstructionsChecks Before Starting TransportingSnow Plowing Tips Changing Angle of the BladeDozing Tips Daily StorageLubricate Dozer Blade MaintenanceSchedule For Normal Care Spring Tension AdjustmentsSkid Shoe Adjustment Adjustments Lift Rod AdjustmentInitial Setup Assembly Qty DescriptionInitial Setup & Assembly Initial Setup & Assembly Assemble BladeInstall Blade Assemble Lift RodInstall Angling Control Rod Attaching Removing Removing & Attaching Dozer BladeHardware Identification & Torque Specifications