TV 3 (.9 m)
165 feet maximum
(50 meters)
Rain Collector Installation
•To ensure accurate rain measurement, the rain collector MUST be placed on a flat, level surface.
•Ensure the rain collector is not placed in a low spot that could become flooded or in an area where there are obstructions above it.
OK
1.Separate the rain collector cover from the rain collector base.
2.Locate the two holes on the rain collector base.
3.Fasten the rain collector base to a sturdy surface, like a deck railing or a fence post, with screws (included) using hand tools. (Power tools may slip during installation, causing damage to the rain collector.)
SQUEEZE
Setup is Complete
The rain collector will now synchronize with the display unit. It may take a few minutes for synchronization to complete. Please refer to the troubleshooting section of this manual if anything appears to be functioning improperly.
7