| Page 2 | Pentair Water Commercial Pool and Spa |
|
|
|
|
|
|
|
|
|
TABLE OF CONTENTS
SECTION 1. |
| |
General Information |
| |
1A. | Introduction | 3 |
SECTION 2. |
| |
Installation |
| |
2A. | Boiler Placement | 3 |
2B. | Installation of Indoor Boilers | 4 |
Combustion Air Supply | 4 | |
Venting | 5 | |
2C. | Installation of Outdoor Water Units | 5 |
2D. | Freeze Protection | 6 |
2E. | Gas Supply and Piping | 6 |
2F. | Electrical Wiring | 7 |
2G. | Piping of System to Boiler | 7 |
2H. | General Water Piping | 7 |
2I. | Boiler | 8 |
2J. | Automatic Chlorinators | 8 |
2K. | Pressure Switch | 8 |
SECTION 3. |
| |
Operation |
| |
3A. | Initial Start Up | 9 |
Initial Filter Cycle on a New Pool | 9 | |
Starting Instructions | 9 | |
10 | ||
3B. | To Start Up System |
|
| (See Section 3A for Initial Start Up) | 10 |
3C. | To Turn Off Boiler | 10 |
3D. | Spring and Fall Operation | 10 |
3E. | Winter Operation | 10 |
Draining Boiler Before Freezing | 10 | |
Improper Use of the Boiler | 10 | |
3F. | Time Clock Operation | 11 |
3G. | Spa (Hot Tub) Safety Rules | 11 |
3H. | Periodic Service | 11 |
3I. | Pool Water Chemistry | 11 |
SECTION 4. |
| |
Maintenance |
| |
| ................................................................... | 12 |
SECTION 5.
Troubleshooting and Analysis of
Service Problems
................................................................... 12
SECTION 6.
Conversion of Model MT Pool Boilers From Indoor to Outdoor Models
6A. | SECTION I | 14 |
6B. | SECTION II | 14 |
SECTION 7.
Parts Description and
Order Numbers
................................................................... 16
Pentair Technical Support
Sanford, North Carolina (8 A.M. to 5 P.M.) Phone: (800)
Fax: (919)
Moorpark, California (8 A.M. to 5 P.M.)
Phone: (800)
Fax: (800)
Web sites: visit www.pentairpool.com and www.staritepool.com