Pentair MT warranty Table of Contents

Page 2

 

Page 2

Pentair Water Commercial Pool and Spa

 

 

 

 

 

 

 

 

 

TABLE OF CONTENTS

SECTION 1.

 

General Information

 

1A.

Introduction

3

SECTION 2.

 

Installation

 

2A.

Boiler Placement

3

2B.

Installation of Indoor Boilers

4

2B-1.

Combustion Air Supply

4

2B-2.

Venting

5

2C.

Installation of Outdoor Water Units

5

2D.

Freeze Protection

6

2E.

Gas Supply and Piping

6

2F.

Electrical Wiring

7

2G.

Piping of System to Boiler

7

2H.

General Water Piping

7

2I.

Boiler By-Pass Piping

8

2J.

Automatic Chlorinators

8

2K.

Pressure Switch

8

SECTION 3.

 

Operation

 

3A.

Initial Start Up

9

3A-1.

Initial Filter Cycle on a New Pool

9

3A-2.

Starting Instructions

9

3A-3.

Hi-Limit Checkout

10

3B.

To Start Up System

 

 

(See Section 3A for Initial Start Up)

10

3C.

To Turn Off Boiler

10

3D.

Spring and Fall Operation

10

3E.

Winter Operation

10

3E-1.

Draining Boiler Before Freezing

10

3E-2.

Improper Use of the Boiler

10

3F.

Time Clock Operation

11

3G.

Spa (Hot Tub) Safety Rules

11

3H.

Periodic Service

11

3I.

Pool Water Chemistry

11

SECTION 4.

 

Maintenance

 

 

...................................................................

12

SECTION 5.

Troubleshooting and Analysis of

Service Problems

................................................................... 12

SECTION 6.

Conversion of Model MT Pool Boilers From Indoor to Outdoor Models

6A.

SECTION I

14

6B.

SECTION II

14

SECTION 7.

Parts Description and

Order Numbers

................................................................... 16

Pentair Technical Support

Sanford, North Carolina (8 A.M. to 5 P.M.) Phone: (800) 831-7133

Fax: (919) 566-8920

Moorpark, California (8 A.M. to 5 P.M.)

Phone: (800) 831-7133

Fax: (800) 284-4151

Web sites: visit www.pentairpool.com and www.staritepool.com

Image 2 Contents
MegaThermTM Table of Contents General Information Installation2A. Boiler Placement 1A. Introduction2B. Installation of Indoor Boilers 2B-1. Combustion Air Supply2C. Installation of Outdoor Units 2B-2. Venting2D. Freeze Protection 2E. Gas Supply and Piping2H. General Water Piping 2F. Electrical Wiring2G. Piping of System to Boiler 2J. Automatic Chlorinators 2K. Pressure Switch2I. Boiler By-Pass Piping 3A-1. Initial Filter Cycle on a New Pool Operation3A. Initial Start-Up 3A-2. Starting Instructions3D. Spring and Fall Operation 3B. To Start Up System See a for Initial Start Up3C. To Turn Off Boiler 3E. Winter Operation3F. Time Clock Operation 3G. Spa Hot Tub Safety Rules3H. Periodic Service 3I. Pool Water ChemistryMaintenance Pilot LocationTroubleshooting and Analysis Service Problems Possible Cause What To DoParts List for Conversion 6B. Section II See FigureOutdoor Parts. Referenced on Parts Description and Order Numbers 16Pentair Water Commercial Pool and SpaParts Identification 20010900 Built-in Automatic Control Valve 472644 Rev a 05/22/06