Zenoah BT225 manual SE6 Installing Cutting Head SE6,  13 

Page 13

6. Set up

SE6

■INSTALLING CUTTING HEAD (SE6)

1.While locking the gear shaft by inserting the attached bar into the upper holder and the housing.

2.Rotate the cutting head to engage threads. Hand-tighten it securely.

13

Image 13
Contents BT225 Contents Safety FirstParts location Specifications 3   4   5  Symbols on the machineWorking Condition For safe operationWorking Circumstance  6  7  Working PlanStarting the Engine Before Starting the Engine 8   9  Using the ProductIf Someone Comes MaintenanceHandling Fuel  10  11  Transportation 12  Set up 13  SE6 Installing Cutting Head SE6Fuel HOW to MIX Fuel 14  Recommended Mixing Ratio Gasoline 50OILFor Your Engine LIFE, Avoid Fueling the UnitOP1 OP2 OP3 OP4 Operation 16  Starting EngineOP5 Stopping Engine Adjusting Idling Speed OP5Line Head Usage Trimming Grass and Weeds 18  Adjusting the Line LengthRefilling Trimming Line Maintenance 19   20  AIR Filter MA1 MA2 MA3Fuel Filter Spark Plug 22  MA4Muffler Spark ArresterMA5 MA6 Procedures to be Performed After Every 100 Hours of USE 23  Storage Troubleshooting guideCheck Probable Causes Action  24  25  Parts list 26  Drive Unit BT225 S/N 000001 and up 27   28  Engine Unit BT225 S/N 50100000 and upDescription Part Number Qty Key#  29 Limited Warranty RedMax Garantie limitée Komatsu Zenoah America INC