Buhler FK366 warranty Assembly

Page 26

45 Series Rotary Tiller

ASSEMBLY

The machine is shipped with the PTO shaft not installed.

To install the PTO driveline on the machine, follow this procedure:

1.Clear the area of bystanders, especially small children.

2.Clean the splines on the yoke and the input shaft.

3.Align the splines on the yoke and the shaft.

4.Depress the locking pin and slide the yoke on the shaft.

5.Be sure the yoke is locked in position. Pull on the yoke to be sure the pin clicks into position.

6.Be sure that the PTO shaft is the appropriate length for the tractor/Tiller combination. Refer to Driveline Dimension Section for details.

25

Image 26
Contents Table of Contents Description Important Facts Warranty ClaimsWarranty Labor Introduction Safety Think SAFETY! Work SafelyGeneral Safety Operating SafetyStorage Safety Maintenance SafetyTransport Safety Safety SignsWork Safely How to Install Safety signsSafety Sign Locations Safety Sign Locations cont’d Operation To the NEW Operator or Owner Machine ComponentsPRE-OPERATION Checklist Machine BREAK-INPoint Hitch Horsepower vs. WidthEquipment Matching Load Sensing HydraulicsDriveline Dimension Driveline Dimension Contd ATTACHING/UNHOOKING Field Operation Field Operation contd Field Operation contd Speed vs. weight Ratio TransportingStorage Greasing Service and MaintenanceFluids and Lubricants Servicing Intervals Hours or once a seasonServicing Intervals cont’d Hours Annually Tine Replacement Maintenance Frame Adjustment Clutch Maintenance Slip ClutchTrouble Shooting Problem Cause SolutionAssembly English Torque Specifications Bolt TorqueSeries Tiller Series Rotary Tiller Parts List When Ordering Parts Item # DescriptionAdjustment Mount Bracket Page Series Tiller Gearbox #906913 Series Rotary Tiller Series Tiller PTO Parts List Tiller c/w PTO Shipping BundlesQuantity Bundle Required Number