Briggs & Stratton 30231 Operating The Generator, Cold Weather Operation, Starting the Engine

Page 8
OPERATING THE

OPERATION

OPERATING THE

GENERATOR

Starting the Engine

Disconnect all electrical loads from the generator. Use the following start instruction steps in numerical order:

1.Make sure unit is on a level surface.

IMPORTANT: Failure to start and operate unit on a level surface will cause the unit not to start or shut down during operation.

2.Turn petrol valve to “On” position (Figure 4).

Figure 4 — Petrol Valve

Petrol Valve is shown in “On” position

3.Start engine according to instructions given in engine operator’s manual.

Starting the Engine WARNING

Rapid retraction of starter cord (kickback) will pull hand and arm toward engine faster than you can let go.

Broken bones, fractures, bruises or sprains could result.

When starting engine, pull cord slowly until resistance is felt and then pull rapidly to avoid kickback.

NEVER start or stop engine with electrical devices plugged in and turned on.

NOTE: If engine starts after 3 pulls but fails to run, or if unit shuts down during operation, make sure unit is on a level surface and check for proper oil level in crankcase. This unit may be equipped with a low oil protection device. See engine operator’s manual.

Connecting Electrical Loads WARNING

Running engines produce heat.Temperature of muffler and nearby areas can reach or exceed 65°C (150°F).

Severe burns can occur on contact.

Exhaust heat/gases can ignite combustibles, structures or damage petrol tank causing a fire.

DO NOT touch hot surfaces and avoid hot exhaust gases.

Allow equipment to cool before touching.

Keep at least 1.5 m (5 ft,) clearance on all sides of generator including overhead.

Connecting Electrical Loads

Let engine stabilize and warm up for a few minutes after starting.

Plug in and turn on the desired 110 and/or 220 Volt AC, single phase, 60 Hz electrical loads.

DO NOT connect 220 Volt loads to the 110 Volt duplex receptacles.

DO NOT connect 3–phase loads to the generator.

DO NOT connect 50 Hz loads to the generator.

DO NOT OVERLOAD THE GENERATOR. See “Don’t Overload Generator”.

CAUTION

Exceeding generators wattage/amperage capacity can damage generator and/or electrical devices connected to it.

See “Don’t Overload Generator”.

Start generator and let engine stabilize before connecting electrical loads.

Connect electrical loads in OFF position, then turn ON for operation.

Turn electrical loads OFF and disconnect from generator before stopping generator.

Stopping the Engine

1.Turn OFF and unplug ALL electrical loads from generator panel receptacles. NEVER start or stop engine with electrical devices plugged in and turned ON.

2.Let engine run at no-load for several minutes to stabilize internal temperatures of engine and generator.

3.Move fuel valve to “Off” position.

4.Turn engine off according to instructions given in the engine operator’s manual.

COLD WEATHER

OPERATION

Under certain weather conditions (temperatures below 4°C [40°F] combined with high humidity), your generator may experience icing of the carburetor and/or the crankcase breather system.To reduce this problem, you need to perform the following:

1.Make sure generator has clean, fresh petrol.

2.Open petrol valve (turn valve to open position).

3.Use SAE 5W-30 oil (synthetic preferred, see engine operator’s manual).

8

Image 8
Contents BRIGGS & STRATTON POWER PRODUCTS GROUP, LLC 5400 STARTING WATTSOperator’s Manual JEFFERSON,WISCONSIN, U.S.ATABLE OF CONTENTS SAFETY RULESHazard Symbols and Meanings SAFETY RULESWHEN ADDING OR DRAINING PETROL WHEN STARTING EQUIPMENTWHEN OPERATING EQUIPMENT WHEN TRANSPORTING OR REPAIRING EQUIPMENTSevere burns can occur on contact FEATURES AND CONTROLS KNOW YOUR GENERATORASSEMBLY ASSEMBLYBEFORE STARTING THE ENGINE Remove Generator From CartonUSING THE GENERATOR Connecting to a Building’s Electrical SystemSystem Ground Generator LocationConnecting Electrical Loads OPERATING THE GENERATORCOLD WEATHER OPERATION Starting the EngineCreating a Temporary Shelter Creating a Permanent ShelterRECEPTACLES 110/220 Volt AC, 20 Amp Locking Receptacle110 Volt AC, 15 Amp, GFCI Duplex Receptacles NEMA L14-20Ground Fault Protection Testing the GFCICapacity Power ManagementDONT OVERLOAD GENERATOR SPECIFICATIONS GENERAL MAINTENANCE RECOMMENDATIONSEngine Maintenance Generator MaintenanceSTORAGE Generator StorageEngine Storage Other Storage TipsTROUBLESHOOTING TROUBLESHOOTINGProblem SolutionLIMITED WARRANTY WARRANTY PERIODABOUT YOUR WARRANTY BRIGGS & STRATTON POWER PRODUCTS GROUP, LLC