Baldor Series PC Mutlifuel manual Product Safety Information MN2413

Page 10

Caution Statements

Caution: The brass connecting tab on some 120VAC duplex receptacles have been removed. Each receptacle is powered by a separate generator winding. When replacing a receptacle, inspect the brass tab that normally links both receptacles. If it is removed, be sure to remove the brass tab from the replacement receptacle before it is installed. Failure to remove the tab will cause a direct short to the generator windings and cause possible generator damage.

Caution: Avoid installing the generator set beside heat generating equipment, or directly below water or steam pipes or in the vicinity of corrosive substances or vapors, metal particles and dust. Heat can cause engine problems to develop and unwanted substances can cause rust or generator failure over time.

Caution: Do not apply high voltage to windings in a moisture–saturated condition. Moisture can cause insulation breakdown, making it necessary to return the generator to the factory for repair, and consequent expense and loss of time.

Caution: Use only original equipment or authorized replacement parts. Using the correct parts will assure continued safe operation as designed.

Caution: Do not support the generator from the top of the wrap frame.

Caution: Do not tamper with or change the engine speed. Engine speed is factory set to produce the correct voltage and output frequency.

Caution: Never operate the engine without a muffler. The engine is designed to have the correct exhaust components installed and operating without these components can present a fire hazard, cause excessive exhaust gases and cause damage to engine. Inspect muffler periodically and replace if necessary.

1-6 Product Safety Information

MN2413

Image 10
Contents PowerchiefR POW’R Products Generator California Proposition 65 Warning Table of Contents Ii Table of Contents MN2413 Section Product Safety Information Read This Manual ThoroughlyProperty Precaution Statements Used In This ManualOperation Operation Warning Statements Burn Installation Maintenance Product Safety Information MN2413 Limited Warranty Section General InformationOwner’s Responsibilities Section Receiving & Installation PowerchiefR Multifuel Generators StorageInstallation Receptacle Connections Frame Ground ConnectionSecondary Regulator supplied General Considerations Pipe SizePrimary Regulator not supplied LP TanksNatural Gas Flow Rate Cubic Feet per Hour per Pipe Length Natural Gas ConnectionsNeed correct artwork LP Gas Connections Propane LP Gas Flow Rate Cubic Feet per Hour per Pipe LengthBattery Connections Engine OilRecommended Engine Oil and Battery Type Use of Electric Motor LoadsSection Operation Operator Control PanelElectric Start Gasoline Start-Up ProcedureRecoil Start Gaseous Fuel Start-Up Procedure Natural Gas or LPG Stopping ProcedureOperation MN2413 General Section Troubleshooting and MaintenanceEngine Troubleshooting Guide Problems and SolutionsService Appendix a PowerchiefR Multifuel Series Operator Panel ConfigurationReplacement Parts Figure A-2 Alternator AssemblyControl Box Operator Panel Figure A-4 PCM60RE Wiring Diagram Figure A-5 PCM90VE Wiring Diagram Powerchief R Multifuel Series MN2413 Baldor District Offices Baldor Generators