Baldor Series PC Mutlifuel Appendix a PowerchiefR Multifuel Series, Operator Panel Configuration

Page 27

Appendix A

PowerchiefR Multifuel Series

Information in this Appendix applies to the following Baldor Generators:

PCM60RE, PCM90VE

Caution: The brass connecting tab on some 120VAC duplex receptacles have been removed. Each receptacle is powered by a separate generator winding. When replacing a receptacle, inspect the brass tab that normally links both receptacles. If it is removed, be sure to remove the brass tab from the replacement receptacle before it is installed. Failure to remove the tab will cause a direct short to the generator windings and cause possible generator damage.

Operator Panel Configuration

Figure A-1 PCM60RE and PCM90VE Operator Panel

NEMA 5-20R GFCI Receptacle.

This ground fault circuit interrupter duplex receptacle is rated at 125VAC, 20 Amps.

NEMA L5-30R Receptacle. Twist-lock style receptacle rated for 125VAC, 30 Amps.

NEMA L14-30R Receptacle. Twist-lock style receptacle rated for 125/250VAC, 30 Am

120 VOLTS

Circuit Breakers.

Provide overload protection for the generator set.

120 VOLTS

CIRCUIT BREAKERS

120/240 VOLTS

Press to Reset

MN2413

PowerchiefR Multifuel Series A-1

Image 27
Contents PowerchiefR POW’R Products Generator California Proposition 65 Warning Table of Contents Ii Table of Contents MN2413 Read This Manual Thoroughly Section Product Safety InformationPrecaution Statements Used In This Manual PropertyOperation Operation Warning Statements Burn Installation Maintenance Product Safety Information MN2413 Section General Information Limited WarrantyOwner’s Responsibilities PowerchiefR Multifuel Generators Storage Section Receiving & InstallationInstallation Frame Ground Connection Receptacle ConnectionsLP Tanks General Considerations Pipe SizePrimary Regulator not supplied Secondary Regulator suppliedNatural Gas Connections Natural Gas Flow Rate Cubic Feet per Hour per Pipe LengthNeed correct artwork Propane LP Gas Flow Rate Cubic Feet per Hour per Pipe Length LP Gas ConnectionsEngine Oil Battery ConnectionsUse of Electric Motor Loads Recommended Engine Oil and Battery TypeOperator Control Panel Section OperationGasoline Start-Up Procedure Electric StartRecoil Start Stopping Procedure Gaseous Fuel Start-Up Procedure Natural Gas or LPGOperation MN2413 Section Troubleshooting and Maintenance GeneralEngine Problems and Solutions Troubleshooting GuideService Operator Panel Configuration Appendix a PowerchiefR Multifuel SeriesFigure A-2 Alternator Assembly Replacement PartsControl Box Operator Panel Figure A-4 PCM60RE Wiring Diagram Figure A-5 PCM90VE Wiring Diagram Powerchief R Multifuel Series MN2413 Baldor District Offices Baldor Generators