4.Connect the user load cables L1 and L2 between the control box and the house.

5.Connect the ballast load (C) to the control box and user load cable. The ballast load is rated 10-15% (maximum) higher than the rated power output of the generator e.g. 2.2kW for model MHG-T2. As such, it will become hot, up to

100°C. To prevent injury and the risk of fire, the ballast load must be installed in a safe place and preferably in an additional enclosure.

6.Close the generator terminal box and the control box door. The system is now ready for its first operation.

OPERATION

1.Check that the power conduit and forebay are free of debris.

2.Ensure that the turbine is shut down and that all supply lines are electrically dead. The switch on the door of the control box must be in the ‘off’ position.

3.Fill the forebay and allow the water to flow freely into the penstock. The spear valve should be fully closed, then backed out one full turn at this stage. The turbine runner will rotate and spent water will escape through the floor of the platform.

4.As the water flow starts to create electric power, the voltage will rise until the voltmeter on the control box reads 230V. Once this occurs, turn the control box switch to the ‘on’ position and then adjust the water flow with the spear valve so that the voltage stays at 230V. The voltage will then fall to 220V after a minute or two.

PowerPalT2 Turgo 10

Image 10
Contents Models MHG-T2 Read this First Safety FirstOperating Cautions Powerpal Components System DiagramForebay, or water Selecting a Site Measuring Gross HeadMeasuring Flow Site PreparationPowerPal T2 Turgo Mechanical Aspects System InstallationElectrical Aspects Hydro turbine ABCOperation Care and Maintenance Greasing the BearingsChanging the Bearings and Seal Troubleshooting Power output has been falling recently Technical Specifications MHG-T2Appendix a Forebay Design Powerpal T2 Turgo Models Output watts