SECTION 6: MAKING ADJUSTMENT

WARNING: NEVER attempt to make any adjustments while the engine is running, except where specified in the operator’s manual.

Auger Control Adjustment

Refer to the information found under Final Adjust- ments in the Assembly Section to adjust the auger control.

Traction Control Adjustment

Refer to the information found under Final Adjustment in the Assembly Section to adjust the traction control. If you are uncertain that you have reached the correct adjustment, proceed as follows:

WARNING: Drain the gasoline out of the snow thrower’s tank, or place a piece of plastic film under the gas cap to avoid spillage BEFORE making the adjustment.

Tip the snow thrower forward, allowing it to rest on the auger housing.

Remove the frame cover underneath the snow thrower by removing the six self-tapping screws.

With the traction control released, there must be clearance between the friction wheel and the drive plate in all positions of the shift lever.

With the traction control engaged, the friction wheel must contact the drive plate. See Figure 14.

Gear Shaft

Drive

Cable

Friction Wheel

Pivot Rod

 

Rubber

 

 

Drive

 

Plate

Figure 14

If adjustment is necessary:

Loosen the jam nut on the traction drive cable. Adjust the cable as necessary. Refer to Figure 8.

Retighten the jam nut to secure the cable when correct adjustment is reached.

Reassemble the frame cover.

Chute Directional Control And Support Bracket Adjustment

If the spiral at the base of the chute directional control is not fully engaging with the notches in the lower chute assembly, the support bracket can be adjusted inward or outward as follows:

Loosen, but do NOT remove the two hex nuts which secure the chute directional control support bracket to the snow thrower housing.

See Figure 15.

 

Spiral

Hex Nuts

Support

Bracket

 

Figure 15

Adjust the support bracket inward or outward so that the spiral is fully engaged in the notches on the chute before retightening the hex nuts.

Shift Rod Adjustment

To adjust the shift rod, proceed as follows:

Remove the hairpin clip and slide the shift rod connector up, to separate the upper shift rod from the lower shift rod. See Figure 16.

Hairpin

 

 

Clip

Flat

 

 

 

 

Washer

 

 

Ferrule

Shift Rod

Shift Arm

Flat

 

Assembly

Washer

 

 

 

Hairpin

 

 

Clip

Figure 16

13

Image 13
Contents OPERATOR’S Manual Table of Contents Training Important Safe Operation PracticesPreparation OperationYour Responsibility Maintenance And StorageContents of Hardware Pack Attaching Chute Assembly Attaching Handle AssemblyAssembling Your Snow Thrower UnpackingHardware C Attaching Shift RodUse Hardware D Skid Shoe Adjustment Auger Control AdjustmentAttaching Control Cables Attaching Track ControlsKnow Your Snow Thrower Traction Control and Shift Lever AdjustmentAuger Drive Control Shift Lever Safety Ignition KeyChute Directional Control Skid ShoeOperating Your Snow Thrower To Stop Engine Recoil StarterTo Engage Track Drive To Engage AugersTraction Control Adjustment Auger Control AdjustmentChute Directional Control And Support Bracket Adjustment Shift Rod AdjustmentChute Assembly Skid Shoe AdjustmentMaintaining Your Snow Thrower LubricationServicing Your Snow Thrower Belt Removal And ReplacementEngine AugersDrive Belt Servicing Friction Wheel RubberOff-season Storage Problem Cause Remedy TroubleshootingPart Description Model E740FModel E740F Part Description Model E740F Part Description 315 Model E740F 4039 Model E740F Model E740F Model E740F Page Page MANUFACTURER’S Limited Warranty for