4.Finish securing chute control assembly to chute support bracket with wing nut and hex screw removed earlier. See Figure 4.
5.Check that all cables are properly routed through the cable guide on top of the engine. See Figure 5.
The extension cord is fastened with a cable tie to the rear of the auger housing for shipping purposes. Cut the cable tie and remove it before operating the snow thrower.
CAUTION: Prior to operating your snow thrower, refer to Auger Control Test on page 13. Read and follow all instructions carefully, and perform all adjustments to verify your snow thrower is operating safely and properly.
4 | 3 |
|
Setting Up
Your Snow
Thrower
Figure 4 | CAUTION |
| |
| Prior to operating |
| your snow thrower, |
5 | refer to Auger Control |
Test on page 13. | |
| Read and follow all |
| instructions care- |
| fully and perform all |
| adjustments to verify |
| your unit is operating |
| safely and properly. |
Figure 5
Shear Pin Storage
An area for convenient shear pin storage is located under the plastic dash panel. See Figure 6.
Figure 6
7