Seymour Duncan 67372 Maintenance Schedule Components Daily Weekly Pre Season, Bolted Connections

Page 29

Maintenance & Care

Maintenance Schedule

Components

Daily

Weekly

Pre Season

 

(or after 20Ha)

(or after 75Ha)

(or 500 Ha)

Seeders/Agitators/Bottom Flaps

Wheel Nuts

 

Wheel Leg Pivots

 

Roller Chains

 

 

Drive Cassettes

 

Gearbox (Oil level)

 

Tyre Pressure (25psi / 1.8bar)

 

Wheel Bearings

 

Bolted Connections

 

 

 

Seed/Fertiliser Tubes

 

 

 

Framewok

 

 

 

 

 

 

 

1 Bolted Connections

All bolted connections of the machine should be checked after the first 30 hours of operation and retightened if necessary and thereafter at regular intervals. It is suggested that this is done every 500 hectares or annually, whichever occurs first.

2 Gearbox

The oil level in the gearbox can be seen in the oil gauge window (1). Changing the gearbox oil is normally not necessary. For refilling the oil remove the 1/2” BSP plug on the top face of the gearbox (2), Castrol Oil Agri Trans Plus should be used. The total filling capacity is 1.25 litres (refer Fig 18).

DO NOT OVERFILL.

21

Fig 18

Pt. No. 67372 Issue 0806

27

Image 29
Contents From Serial Number Vineyard SeederPage Vineyard Seeder Contents Disclaimer Acquisition & WarrantyIntroduction Dimensions & Capacities SpecificationDescription of Machine Working PrinciplePage Be Prepared for Emergencies Safety GeneralOperator Safety Transport This Machine Safely Appropriate DressDo not ride or allow passengers on the machine Road transportSafe Work Practices Handle Agricultural Chemicals SafelyAvoid High Pressure Fluids Practise Safe Maintenance Hazard Points on the Vineyard Seeder Safety Machine SpecificGuards MaintenanceBox Lifting Profiles CalibratingSafety Decals Safety Guards Decal/Guard Cross Reference Qty Operation TransportMaximum towing speed 40 km/hr General Operation GuidelinesSowing Depth Control Sowing SpeedRow Spacing Vineyard Seeder Sowing ChartGearbox Setting Lever Basic Calibration ProcedureSetting Seeder Shutter Slides Bottom Flap SettingsSeed Calibration Seed Calibration ProceduresHand Crank Turns for Seed Rate Calibration Sowing Width Turns for HectareSetting Example Desired Seed Rate 125kg/ha Determining the gear box scale setting using the calculatorRecalculating the Constant Use of Seed Rate CalculatorDeviations Between the Calibration Test Actual Seed Rate Calibration DeviationsWheel Slip Deviations To check number of crank turns for calibrationSowing Fine Seeds Calibration with Disconnected Agitator Shaft Sowing Small SeedsSowing Width Hectaremeter Settings SetupSowing Peas Setting = 2224mm Hectaremeter SettingsVineyard Seeder Calibration Notes General Cautionary Maintenance Advice General Safety and Accident Prevention AdviceLubrication Chart Precautions with Grease Lubrication PrecautionsLubrication Instructions Components Lubricant FrequencyGearbox Maintenance Schedule Components Daily Weekly Pre SeasonBolted Connections Maintenance Schedule Bottom Flaps Fig StoragePreparing the Machine for Storage Vineyard Seeder Maintenance Notes From Serial Number Parts List25 27 28 13 14 Vineyard Seeder Complete AssemblyDescription Qty Mainframe & Wheel Leg Arrangment Mainframe & Wheel Leg Arrangement Vineyard Seeder Wheel Leg & Axle Assembly Vineyard Seeder Wheel Leg & Axle Assembly Vineyard Seeder Single Disc Dragbars 27461 Corrugated Hose 12 11 5 15 16 Vineyard Seeder Double Disc DragbarsDescription Vineyard Seeder Complete Drive Arrangement Description Qty Chain Tensioner Vineyard Seeder Front Box ShaftVineyard Seeder Rear Box Shaft 14 11 10 8 9 Vineyard Seeder Gearbox Input Drive SystemVineyard Seeder Seed Box Drive Shafts 14, 15, 16 Gearbox Final AssemblyVineyard Seeder Gearbox Final Assembly Seedbox Assembly Vineyard Seeder Seedbox Assembly Description Agitator DrivesCentre Bearing Drive LH End Vineyard Seeder Agitator AssemblyPlain RH End Vineyard Seeder Seeder Mechanism Vineyard Seeder Hectaremeter Kit Vineyard Seeder Press Wheel Arrangement Vineyard Seeder Press Wheel Arrangement