Transport
1Raise the three point linkage as high as possible to maximise ground clearance. Ensure ground clearance is sufficient. Do not transport with the wheels in contact with the ground.
2Ensure that all linkage pins and security clips are fitted and are secure.
3Ensure that the jack stand has sufficient ground clearance. Raise into the upper position if required.
4Ensure lighting and oversize warning requirements meet recommendations published by the local Land Transport Authority or equivalent.
5Maximum towing speed 40 km/hr.
For countries other than New Zeaand greater speed restrictions may apply, please refer to your local transport authority.
Ensure towing vehicle requirements are adequate for the towed vehicle e.g. mass, brakes. Refer to recommendations published by the local Land Transport Authority or equivalent.
Lower towing speeds are recommmended on farm roads/tracks and where one wheel is on or over a road verge.
Operation
General Operation Guidelines
1Use a sufficiently powerful tractor which is heavy enough to operate the drill safely.
2Operate the drill at a speed of
In stoney and uneven ground conditions a lower speed is more appropriate.
3Check that the drill is level during calibration and while seeding.
4Check tyre pressure before seeding. Refer page 3.
5Double check seed rates before seeding.
6Raise the drill out of the ground when making any turns.
7Raise the drill out of the ground before backing up.
8Ensure the jack stand is in the raised position.
9After prolonged storage, check to see that all drive mechanisms and hydraulic equipment are functioning correctly. Check that the seed tubes are not perished or blocked.
12