ViewSonic manual VS375C/VS575C, Powering Up Your UPS

Page 16

10

VS375C/VS575C

ViewSonic G810

Computer Co

120V 2.7A

Pentium Pro 200MHz

50 / 60 Hz

120V 2.0A

SN: Q771515388

50/60 Hz

 

SN: 123456

3.Multiply the voltage and current of each piece of equipment (VA requirements); for example, 120V x 2.7A = 324VA, 120V x 2.0A = 240VA.

Add up the VA requirements for all the devices; for example, 324VA + 240VA = 564VA.

4.Make sure that your UPS has at least as much VA capacity as your equipment requires.

3.4Powering Up Your UPS

1.For 100/110V/120V versions, connect the power cord to a grounded 3-wire receptacle. For 220V/230V/240V versions, please refer to Sec 3.5 .

2.Power up the UPS by pressing the On/Off switch on the front panel for three seconds.

3.We recommend that you charge the battery for six (6) hours before first use of your UPS. You may use the UPS immediately without charging the battery, but the backup time may be less than the rating. The UPS recharges the battery automatically whenever AC power is available.

Image 16
Contents User’s Guide For your records Who the warranty protects Exclusion of damages Life Support Page Important Safety Instructions Save These Instructions VS375C/VS575C Federal Communications Commission FCC Warning Table of Contents Overview User Replaceable Battery DesignFrequency Auto Sensing Schedule Shutdown & Startup Over Voltage and Under Voltage ProtectionData-Line Surge Protection External Views Power On/Off/Test/Silence Button Communication Port Remote Port Unpacking and Inspection PlacementDetermining How Much Equipment You Can Connect to Your UPS Powering Up Your UPS VS375C/VS575CConnecting Your Equipment to the UPS Operation and Function TestStorage Instructions Electrical Specifications Output Inverter modeMechanical Specifications Environmental SpecificationsTroubleshooting Chart Problem Possible CauseUser Replaceable Battery Battery Replacement Procedure for VS375C/ VS575C Fuse Replacement Procedure