Eiki AH-69601 owner manual Precaution Before Installation, Procedure of Installation

Page 5

INSTALLATION

INSTALLATION

PRECAUTION BEFORE INSTALLATION

Please ensure that there is sufficient clearance around the unit at the time of installation, as shown in the figure on the right.

WARNING: DO NOT COVER INTAKE VENTS.

If the Air Intake is covered, there will be in- sufficient cooling which may result in failure or fire.

At least 20'' (50cm)

At least

30''

(75cm)

At least

40''

(100cm)

AIR INTAKE VENTS

FRONT

CAUTION:UNPLUG THE PROJECTOR FROM THE AC OUTLET WHEN INSTALLING THE SMOKE RESISTANT BOX.

ATTACHING THE SMOKE RESISTANT BOX WHILE THE PROJECTOR IS CONNECTED TO ELECTRICITY MAY DAMAGE THE BOX OR CAUSE IT TO MALFUNCTION.

PROCEDURE OF INSTALLATION

1

2

Take out the Smoke Resistant Box from the packaging and place it on a flat surface with the projector.

Take off the connector cover from the Projector.

RETAIN THE CONNECTOR COVER.

WHEN THE SMOKE RESISTANT BOX IS NOT

BEING USED, REATTACH THE CONNECTOR

COVER TO THE PROJECTOR TO PROTECT

THE CONNECTOR.

CONNECTOR COVER

5

Image 5
Contents Model AH-69601 Risk of Electric Shock Do not Open To the OwnerFeatures Table of ContentsPart Names Part NamesInstallation InstallationPrecaution Before Installation Procedure of InstallationConnector or Apply Shock Pins That MAY Damage the Connector Operation Indicators OperationOperation Initial SET-UP Before USEFilter Replacement Open the filter cover and take out the used filter Filter Time Check Filter Time Check and ResetResetting the Filter Time Appendix MaintenanceTroubleshooting Specifications DimensionsPage Key to better communications Canada