Lenovo E49 manual Checking operational charging, Checking the battery pack

Page 37

• If the problem persists, go to Chapter 5 “Lenovo E49 and ZhaoYang E49” on page 37.

Note: Noise from the ac power adapter does not always indicate a defect.

Checking operational charging

To check whether the battery charges properly during operation, use a discharged battery pack or a battery pack that has less than 50% of the total power remaining when installed in the computer.

Perform operational charging. If the battery status indicator or icon does not turn on, remove the battery pack and let it return to room temperature. Reinstall the battery pack. If the charge indicator or icon still does not turn on, replace the battery pack.

If the charge indicator still does not turn on, replace the system board. Then reinstall the battery pack. If it is still not charged, go to the next section.

Checking the battery pack

Battery charging does not start until the power meter shows that less than 95% of the total power remains; under this condition the battery pack can charge to 100% of its capacity. This protects the battery pack from being overcharged or from having a shortened life.

To check your battery, move your cursor to the power meter icon in the icon tray of the Windows® taskbar and wait for a moment (but do not click it), and the percentage of battery power remaining is displayed. To get detailed information about the battery, double-click the power meter icon.

Note: If the battery pack becomes hot, it may not be able to be charged. Remove it from the computer and leave it at room temperature for a while. After it cools down, reinstall and recharge it.

To check the battery pack, do the following:

1.Power off the computer.

2.Remove the battery pack and measure the voltage between battery terminals 1 (+) and 7 (-). See the following figure:

Terminal

Voltage (V dc)

 

 

1

+ 0 to + 14

 

 

7

Ground (-)

 

 

3.If the voltage is less than +11.0 V dc, the battery pack has been discharged.

Note: Recharging will take at least 3 hours, even if the indicator does not turn on. If the voltage is still less than +11.0 V dc after recharging, replace the battery.

4.If the voltage is more than +11.0 V dc, measure the resistance between battery terminals 5 and 7. The resistance must be 4 to 30 K Ω.

If the resistance is not correct, replace the battery pack. If the resistance is correct, replace the system board.

Chapter 3. General checkout 31

Image 37
Contents Lenovo E49 and ZhaoYang E49 Hardware Maintenance ManualSecond Edition May Copyright Lenovo Contents Ii Hardware Maintenance Manual About this manual Iv Hardware Maintenance Manual General safety Safety informationElectrical safety Safety inspection guide Grounding requirements Safety notices multilingual translationsSafety information Hardware Maintenance Manual Safety information Perigo Perigo Vorsicht Vorsicht Vorsicht Safety information Hardware Maintenance Manual Safety information Hardware Maintenance Manual Safety information Hardware Maintenance Manual Laser compliance statement multilingual translations Hardware Maintenance Manual Safety information Hardware Maintenance Manual Safety information Hardware Maintenance Manual Safety information Hardware Maintenance Manual Before replacing parts Important service informationStrategy for replacing FRUs Important notice for replacing a system board Strategy for replacing a hard disk driveImportant information about replacing RoHS compliant FRUs For products shipped after JuneGeneral checkout Following are not covered under warrantyWhat to do first Checking the ac power adapter Power system checkoutChecking operational charging Checking the battery packHardware Maintenance Manual Recovering the computer settings Related service informationPasswords Power-on passwordScreen blank mode Power managementSleep mode Hibernation modeRelated service information Hardware Maintenance Manual Specifications Indicator Meaning Status indicatorsKey combination Description Fn key combinationsHardware Maintenance Manual Screw notices FRU replacement noticesCRU statement for customers Plastic to plasticTorque driver General guidelines Removing and replacing a FRUOptical drive Battery packRemoval steps of optical drive Memory modules Bottom slot coverRemoval steps of bottom slot cover Removal steps of memory modules Hard disk drive assemblyRemoval steps of hard disk drive assembly Removal steps of hard disk drive bracket PCI Express Mini Card for wireless LANRemoval steps of PCI Express Mini Card for wireless LAN Removal steps of thermal fan assembly Thermal fan assemblyHardware Maintenance Manual Microprocessor Removal steps of microprocessor KeyboardRemoval steps of keyboard Hardware Maintenance Manual Keyboard bezel Remove the screws That secure the keyboard bezel Removal steps of keyboard bezelPower board Removal steps of power board Backup batteryRemoval steps of backup battery Important notices for handling the system board System board assemblyLCD unit Removal steps of system board assemblyRemoval steps of LCD unit and hinge brackets When installing DC-in cable and base cover Removal steps of DC-in cable and base cover Applying labels to the base cover LCD front bezelRemoval steps of LCD front bezel LCD panel, LCD cable, and hinges Integrated cameraRemoval steps of integrated camera Removal steps of LCD panel and LCD cable Removal steps of hinges Antenna assembly and LCD rear coverRemoval steps of antenna assembly and LCD rear cover Front view LocationsRear view Right-side viewLenovo E49 and ZhaoYang E49 bottom and left-side view Bottom and left-side viewHardware Maintenance Manual CRU statement for customers Parts listCRU OverallParts list CRU LSS MB DIS N13M-GE1 1G E49A WO/3G/BT LCD FRUsFRU Miscellaneous parts Ac power adaptersPower cords Parts list 3-pin power cords Longwell Parts list 3-pin power cords Volex Parts list 2-pin power cords Linetek Hardware Maintenance Manual Appendix A. Notices Trademarks Electronic emissions noticesPage Part Number 1P P/N