E250P/P12SW subwoofers
DETAILED TROUBLESHOOTING
A. Power Amp Section
Resistance | Resistance from S+ (SPK O/P) to GND should be >1M Ω (NO LOAD) | |
Check | ||
| ||
| Resistance from V+ (C6 P+) to V- (C8 | |
|
| |
| Resistance from V+ (C6 P+) to S+ (SPK O/P) should read >1MΩ | |
|
| |
| Resistance from V- (C8 | |
|
|
2. Power Up LED RED
With a 5mV signal to Low level input, LED should change to GREEN
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| OP AMP |
|
|
|
|
|
|
| |
|
| LED |
|
|
|
|
|
|
| |||||
|
| RED |
| 0Vrms | 11.84VDC |
|
|
|
|
|
| |||
| GREEN |
| 7.13Vrms |
|
|
|
|
|
| |||||
| 3. D.C. Operation |
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||
Between |
| V+ |
| Q4(E) | Q1(C) | Q10(C) | U7(1) | U7(2) |
| U7(4) | U7(6) | U7(7) | U7(8) | |
And This |
| GND |
| V- | GND | GND | GND | GND |
| GND | GND | GND | GND | |
Point |
|
|
| |||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||
Get this |
| 71.7V |
| 0V | 0V |
| 0V | 0V | 4.65V | |||||
Reading |
|
|
| |||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
4. Check Switching Frequency
•Oscilloscope - USE THE PROBE TIP TO U6(7) TO GND
•Reading 100kHz
B. Pre Amp Section
Line Level Input Sensitivity
Turn level, X’OVER FREQ POT Fully CW and LFE switch off | |
| Generator Set at 200mV@50Hz |
| Signal to Line level input |
17