Emerson 3U MP2-220N user manual Transfer to Maintenance Bypass, Transfer to UPS, Operation

Page 13

Operation

6.0OPERATION

6.1Transfer to Maintenance Bypass

To transfer to maintenance bypass (utility) from UPS, use the following steps:

1.Ensure the UTILITY lamp (amber) is illuminated. If the lamp is not illuminated, refer to 7.0 - Troubleshooting.

2.Transfer the rotary switch from UPS to UTILITY, provided the UTILITY lamp is illuminated on the 3U POD.

3.Turn the UPS off.

4.Disconnect the two cables connecting the UPS to the 3U POD.

5.You may now service the UPS.

6.2Transfer to UPS

To transfer to UPS from maintenance bypass (utility), use the following steps:

1.Reconnect the UPS to the 3U POD. Start the UPS according to the instructions in the UPS user manual.

2.Verify that UPS lamp (green) on the 3U POD is illuminated. If so, transfer the rotary bypass switch from UTILITY to UPS. If the lamp does not illuminate, refer to 7.0 - Troubleshooting.

9

Image 13
Contents 3U MP2-220N POD Power AvailabilityPage Figures Page Important Safety Instructions Glossary of Symbols Introduction and System Description System DescriptionSide view of 3U POD with mounting bracket Rack Mount InstallationCord-Receptacle Installation and Start-Up Power Connection OptionsInstallation and Electrical Connections Alternate Hardwire Installation Electrical Installation ConsiderationsElectrical Connections Screws Used for Internal Wiring Conversion From Cord-Receptacle to HardwireUPS Indicator Lamp Utility Indicator LampIndicator Lamps Transfer to UPS Transfer to Maintenance BypassOperation Utility TroubleshootingSpecifications Product Warranty RegistrationSpecifications Page Company Behind the Products Technical Support/ServiceLocations