INSTALLATION (continued)

Functional Test

The Functional Test consists of three checks: manual operation, voltage checks, and electrical operation.

Do these checks in the order presented to avoid damaging the automatic transfer switch.

Read all instructions on the Wiring Diagram and labels affixed to the automatic transfer switch. Note the control features that are provided and review their operation before proceeding.

1 – Manual Operation Test

A detachable maintenance handle is provided on the frame of the Transfer Switch for maintenance purposes only. Manual operation of the transfer switch should be checked before it is energized (operated electrically).

Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers.

Turn counterclockwise to Emergency.

Turn clockwise

 

Grasp

 

handle

to Normal.

 

insert

firmly

 

 

 

slide hub

handle

 

into hole

 

onto shaft

 

 

 

Figure 1-3. Maintenance handle.

1.After deenergizing both power sources, open the enclosure door. Locate and remove the mainte- nance handle and hub stored on the transfer switch frame. Then install the hub onto the center operator shaft and insert the handle firmly into the hole in the side of the hub (spring fully compressed). See Figure 1–3 and 1–4 and Table B.

2.If the transfer switch is closed on Normal (window shows CLOSED), grasp handle firmly and turn it counterclockwise. The transfer switch should operate smoothly without binding. If it does not, check for shipping damage or construction debris.

Table B. Maintenance handle positions.

ATS Position

Indicators

 

E

OPEN

Normal

 

upper contacts open

 

CLOSED

 

N

 

lower contacts closed

 

 

 

 

E

CLOSED

Emergency

 

upper contacts closed

 

OPEN

 

 

 

N

lower contacts open

 

 

 

3.Turn the handle clockwise to return the transfer switch to the Normal position. Observe that the window indicators (left side) show the top shaft OPEN and the bottom shaft CLOSED.

Note: If Normal and Emergency connections are

reversed this operation is also reversed.

4.Remove the maintenance handle and hub and store it on the frame in the place provided.

Verify that the maintenance handle has been removed before proceeding!

Now continue to 2 – Voltage Checks on next page.

Emergency contacts

window

indicators

OPEN or

CLOSED

Normal

contacts

contact position

indicators (left side)

counterclockwise DOWN closes the Emergency source contacts (upper) and opens the Normal source contacts (lower)

clockwise DOWN closes the Normal source contacts (lower) and opens the Emergency source contacts (upper)

Figure 1-4. Contact position indicators and maintenance handle operation.

1--3

Image 5
Contents 381333-122 E Operator’s Manual1000 1200 1600 2000 2600 3000 Nameplate Catalog Number IdentificationInstallation Controller Ground Source fails Transfer switchEngine Starting Contacts Auxiliary CircuitsManual Operation Test Installation Functional TestATS Position Indicators Voltage Checks InstallationClose the enclosure door first Electrical OperationTransfer To Emergency Sequence of OperationDisconnecting the Controller Testing & ServicePreventive Maintenance TROUBLE-SHOOTING Testing & ServiceProceed with care Automatic transfer switch is energized Manual Load TransferTime Delay Adjustment AdjustmentsSensor Adjustments Time Delay SettingsClose the enclosure door AdjustmentsHow to Change a Setting DIP Switch Settings Control Features Engine ExercisersHow to Set Built-In Timer BUILT-IN Engine ExerciserProgrammable Engine Exerciser Module Control FeaturesFast / Slow Adjust Display Daylight Savings Time Adjust DisplayFill in your settings for future reference Navigating the MenuLoad Disconnect Feature Remote Control FeaturesInphase Monitor For Motor Load Transfer Strip Heater Accessory Control Features Optional Strip Heater AccessoryAvailable Kits from Asco ControlsIndex