I N STA L L AT I O N
Installation
Before You Begin:
1.Make sure that all computers are powered off and that each PRO2 has been assigned a unique BANK address.
2.Place Master and Slave switches in the desired location. Make sure all are turned off and unplugged from the power source.
3.Connect the Console monitor, keyboard, and mouse to the Console ports of the Master switch or Bank 00, as described previously in this installation guide.
Connecting the Master Switch to the First Slave Switch:
4.Using the
5.Connect the other end of the
Adding Additional Slave Units:
6.Using the
7.Connect the other end of the
(for example, BANK 02).
8.Repeat steps 6 and 7 for additional PRO2s you wish to
14