IBM RS/6000 SP manual Switch power MAP, Purpose of this MAP

Page 31

Switch environment (MAP 0600)

3.Is the yellow switch supervisor LED On or flashing?

v If yes, return to ªStep 0600-010º on page 1-12 and continue service with the next highest priority.

vIf no, go to ªStep 0620-021º on page 1-27.

Switch power (MAP 0610)

Purpose of this MAP

This MAP provides diagnostic steps for resolving problems related to SP Switch2 power.

Note: Refer to ªService position proceduresº on page 3-10 for placing the switch into the service position or removing it from the service position.

Step 0610-001

A power problem with the switch was detected.

1.On the switch, check the status condition of the green switch supervisor LED.

2.Status condition for the green switch supervisor LED is as follows:

Green (power) LED

Off No 48 V dc power available at switch.

Flashing

Power available at switch, but switch logic is Off.

On Power available at switch, and logic is On.

3. Is the green switch supervisor LED Off?

vIf yes, go to ªStep 0610-004º on page 1-14.

vIf no:

±The green switch supervisor LED is On or flashing.

±Go to ªStep 0610-002º.

Step 0610-002

1.Is the green switch supervisor LED flashing?

v If the green LED is flashing, go to ªStep 0610-003º.

vIf the green LED is lit but not flashing:

a.This indicates that you do not have a power supply problem.

b.Verify that you have the proper switch, then restart ªSwitch description and problem determination (MAP 0590)º on page 1-1.

c.If this is the proper switch, call the next level of support.

Step 0610-003

The green switch supervisor LED is flashing.

1.Attempt to power up the switch using Perspectives from the control workstation. v Note the status of the green switch supervisor LED.

2.Does green LED light and stay lit?

v If yes, go to Switch function (MAP 0620) and refer to ªStep 0620-021º on page 1-27 and return the switch to the active configuration.

v If the green LED continues flashing, go to ″Frame supervisor not responding (MAP 0110)″ in RS/6000 SP: System Service Guide.

Chapter 1. Maintenance Analysis Procedures (MAPs) 1-13

Image 31
Contents IBM Page IBM Fourth edition April Contents FRU removals and replacements Figures Vi RS/6000 SP SP Switch2 Service Guide Tables Viii RS/6000 SP SP Switch2 Service Guide Safety notices in English Safety and environmental noticesRS/6000 SP SP Switch2 Service Guide SPSFD017 Xii RS/6000 SP SP Switch2 Service Guide Environmental notices Product recycling and disposal Laser safety informationXiv RS/6000 SP SP Switch2 Service Guide Who should use this book About this bookRelated information How to send your comments How to use this bookUsers responsibilities Purpose of this MAP Maintenance Analysis Procedures MAPsSwitch MAPs Switch description and problem determination MAPSwitch-to-Switch Switch Connection Types Standard NodeSwitch Assembly Description SP Switch2 SP Switch2 Assembly High-Level Diagram Errpt -a -N sphwlog pg Errpt -a -N css0 Errpt -a -N Worm Green Power LEDYellow Environment LED FlashingPriority Message or condition Action SP Switch2 Wrap PlugsGreen LED Yellow LED Indication Switch supervisor communications MAPTogether Switch supervisor communications MAP Switch supervisor communications MAP Condition Action Switch environment MAPPriority Component Action SP Switch2 Chassis Assembly Power supply failure diagnostics Switch power MAP Switch power MAP Step 16RS/6000 SP SP Switch2 Service Guide Estart Switch function MAPSplstdata -n pg EprimaryPg /var/adm/SPlogs/css0/p0/out.top Notes Switch Function MAP Starts the faultserviceWormRTGCS daemon Error # Device Message Link Message Description and ActionVar/adm/SPlogs/css0/p0/out.top file on the primary If the cabling does not match, correct the cabling Priority Condition Action E02-S17-BH-J18E02-N05 E06-S02-BH-J3Step Number Service RequestFailing Component Description Priority Failing Component Action SRN26RS/6000 SP SP Switch2 Service Guide Dsh -w nodelist /usr/lpp/ssp/css/rc.switch Dsh -a /usr/lpp/ssp/css/rc.switch Naming standard for RS/6000 SP components LocationsFormat structure Major assembly Location diagrams of the RS/6000 SP componentsFigure notes Front and rear views of RS/6000 SP frame2shows a front view of the RS/6000 SP multi-switch frame Frame FRA Frame locationsExample E01-FRA-G1 Connector details Switch assembly locationsCable routing Locations Cable routing in a multi-switch frame F/C Cable Part Plug from Plug to Number Location Switch data cables12RS/6000 SP SP Switch2 Service Guide Personal ESD requirements Service proceduresTools and files overview Ifconfig Utility Runs on Description Directory FaultserviceWormRTGCSRc.switch Usr/lpp/ssp/css/rc.switchUsing the css.snap script Var/adm/SPlogs/css Var/adm/SPlogs/cssX where X=0 orVar/adm/SPlogs/cssX/p0 where X=0 or Css.snap file structureMost recent css.snaps readregs Most recent css.snaps ifcldumpMost recent css.snaps splstdata If the -a and -p flags are not used SP Switch2 supervisor self-testCss.snap file package names Disk space handlingSelf-test Conditions Switch supervisor status verification using PerspectivesOpening a switch pane Checking switch statusBase code verification Updating the SP Switch2 supervisor codeRemoving an SP Switch2 from the active configuration Removing and restoring switch resourcesRestoring an SP Switch2 to the active configuration Fencing nodes Efence of primary and primary backup nodesResetting the clock and bootlist after servicing a node Replacing an SP Switch2 from service positionRunning diagnostics on a switch port Handling static-sensitive devices FRU removals and replacementsRemoving a fan assembly SP Switch2 service proceduresReplacing a fan assembly Replacing a power supply Removing a power supplyReplacing the LED bracket assembly Removing the LED bracket assemblyRemoving the switch supervisor card Removing an interposer card Replacing the switch supervisor cardReplacing an interposer card Removing the switch planarRemoving the 48 V dc circuit breaker assembly Replacing the switch planarRemoving the LED power extension cable Replacing the 48 V dc circuit breaker assemblyReplacing the LED power extension cable Parts catalog SP Switch2 assembly view Assembly Part number Units Description Index 4RS/6000 SP SP Switch2 Service Guide Baffle, Power Supply Bay Tray This page intentionally left blank Switch cablesSwitch cables Front SP Switch2 Frame F/CSP Switch2 Frame F/C 2032 frame extender F/C 2032 frame extender SP Switch2 Frame Model 556 and F/C SP Switch2 Frame Model 556 and F/C Model 556 and F/C 2034 frame extender Model 556 and F/C 2034 frame extender 16RS/6000 SP SP Switch2 Service Guide AIX TrademarksEuropean Union EU statement United Kingdom telecommunications safety requirementsIndustry Canada compliance statement Electromagnetic interference EMI statement Taiwan For installations in JapanRadio protection for Germany 4RS/6000 SP SP Switch2 Service Guide Index Numerics Files Created by css.snap Removing LED bracket 4RS/6000 SP SP Switch2 Service Guide How satisfied are you that the information in this book is Readers comments ± Wed like to hear from youPlease tell us how we can improve this book Business Reply Mail Page Ibmr
Related manuals
Manual 114 pages 42.66 Kb

RS/6000 SP specifications

The IBM RS/6000 SP (Scalable Power) is a high-performance computing system that was developed in the early 1990s and has since become a significant player in the realm of supercomputing and enterprise solutions. Designed primarily for scientific, engineering, and complex data analysis tasks, the RS/6000 SP provides powerful processing capabilities, enhanced scalability, and features to support demanding applications.

One of the key characteristics of the RS/6000 SP is its modular architecture, which allows for the addition of multiple nodes. Each node is based on IBM's Power architecture, leveraging the RISC (Reduced Instruction Set Computing) design to achieve high throughput and efficiency. The system can support configurations ranging from a few nodes to hundreds, enabling organizations to scale their computational power as needed based on workload requirements.

The RS/6000 SP employs advanced interconnect technologies, most notably the SP Switch, which ensures high-speed communication between nodes. This interconnect allows for seamless data transfer, ensuring that the system can handle large datasets and complex computations without bottlenecks. The SP's ability to deliver concurrent processing capabilities makes it ideal for parallel computing tasks, including simulations, modeling, and large-scale computations.

In terms of software, the RS/6000 SP was equipped with AIX, IBM's version of the UNIX operating system, which provides a stable and secure environment for enterprise applications. Furthermore, the system supports a vast array of programming languages and tools, including Fortran, C, and C++, along with libraries and frameworks designed for high-performance computing. This compatibility allows developers to optimize their applications to fully utilize the underlying hardware.

Another notable feature of the RS/6000 SP is its extensive support for various workloads, including database management, multi-user applications, and graphical processing. The system was equipped with high-performance graphics capabilities, making it suitable for tasks that require intensive visualization, such as computer-aided design (CAD) and scientific visualization.

Overall, the IBM RS/6000 SP has solidified its role in the high-performance computing landscape, combining advanced technologies, robust scalability, and flexibility to meet the unique demands of research and enterprise environments. Its legacy continues to influence modern computing architectures, embodying IBM’s commitment to innovation and performance in the pursuit of complex problem-solving capabilities.