IBM RS/6000 SP manual Switch function MAP, Estart

Page 35

Switch power (MAP 0610)

Step 0610-022

The switch's front panel power LED remained Off after replacing the LED power extension cable.

1.Replace the switch planar.

v Refer to ªRemoving the switch planarº on page 4-7 and ªReplacing the switch planarº on page 4-8

2.Is the front panel power LED On?

v If yes, go to Switch function (MAP 0620), ªStep 0620-021º on page 1-27 and return the switch to the active configuration.

v If no, call the next level of support.

Step 0610-023

The switch supervisor card was replaced and both the switch front panel and green switch supervisor LEDs remain Off.

1.Replace the switch's circuit breaker assembly.

2.Are both power LEDs On?

vIf yes, go to Switch function (MAP 0620), ªStep 0620-021º on page 1-27 and return the switch to the active configuration.

vIf no, go to ªStep 0610-024º.

Step 0610-024

The switch's circuit breaker assembly was replaced and both the switch front panel and green switch supervisor LEDs remain Off.

1.Replace the switch planar.

2.Are both power LEDs On?

v If yes, go to Switch function (MAP 0620), ªStep 0620-021º on page 1-27 and return the switch to the active configuration.

vIf no, call the next level of support.

Switch function (MAP 0620)

Purpose of this MAP

This MAP provides diagnostic information for problems related to the SP Switch2 function.

Notes:

1.Refer to ªAppendix Aº inRS/6000 SP: Installation and Relocation for frame-to-frame or switch-to-switch cables. Logical frame to physical frame translation information can also be found in this appendix.

2.Refer to ªService position proceduresº on page 3-10 for placing or removing the switch into or from service position.

Step 0620-001

A message in Perspectives indicated that you have a switch function problem and Table 1-1 on page 1-5directed you to this MAP.

1.To complete the following procedures, you will need to have primary node root access. (Customer may enter root password when required.)

2.If either of the following two conditions is true: v Estart has not been run by the customer

vThe CE has already replaced components that might affect the switch. Then from the control workstation, enter:

Estart

Chapter 1. Maintenance Analysis Procedures (MAPs) 1-17

Image 35
Contents IBM Page IBM Fourth edition April Contents FRU removals and replacements Figures Vi RS/6000 SP SP Switch2 Service Guide Tables Viii RS/6000 SP SP Switch2 Service Guide Safety notices in English Safety and environmental noticesRS/6000 SP SP Switch2 Service Guide SPSFD017 Xii RS/6000 SP SP Switch2 Service Guide Environmental notices Product recycling and disposal Laser safety informationXiv RS/6000 SP SP Switch2 Service Guide Related information About this bookWho should use this book Users responsibilities How to use this bookHow to send your comments Purpose of this MAP Maintenance Analysis Procedures MAPsSwitch MAPs Switch description and problem determination MAPSwitch Assembly Description SP Switch2 Switch Connection Types Standard NodeSwitch-to-Switch SP Switch2 Assembly High-Level Diagram Errpt -a -N sphwlog pg Errpt -a -N css0 Errpt -a -N Worm Green Power LEDYellow Environment LED FlashingPriority Message or condition Action SP Switch2 Wrap PlugsTogether Switch supervisor communications MAPGreen LED Yellow LED Indication Switch supervisor communications MAP Switch supervisor communications MAP Condition Action Switch environment MAPPriority Component Action SP Switch2 Chassis Assembly Power supply failure diagnostics Switch power MAP Switch power MAP Step 16RS/6000 SP SP Switch2 Service Guide Estart Switch function MAPPg /var/adm/SPlogs/css0/p0/out.top Notes EprimarySplstdata -n pg Switch Function MAP Var/adm/SPlogs/css0/p0/out.top file on the primary Error # Device Message Link Message Description and ActionStarts the faultserviceWormRTGCS daemon If the cabling does not match, correct the cabling Priority Condition Action E02-S17-BH-J18E02-N05 E06-S02-BH-J3Step Failing Component Description Service RequestNumber Priority Failing Component Action SRN26RS/6000 SP SP Switch2 Service Guide Dsh -w nodelist /usr/lpp/ssp/css/rc.switch Dsh -a /usr/lpp/ssp/css/rc.switch Format structure LocationsNaming standard for RS/6000 SP components Major assembly Location diagrams of the RS/6000 SP componentsFigure notes Front and rear views of RS/6000 SP frame2shows a front view of the RS/6000 SP multi-switch frame Frame FRA Frame locationsExample E01-FRA-G1 Connector details Switch assembly locationsCable routing Locations Cable routing in a multi-switch frame F/C Cable Part Plug from Plug to Number Location Switch data cables12RS/6000 SP SP Switch2 Service Guide Tools and files overview Service proceduresPersonal ESD requirements Ifconfig Utility Runs on Description Directory FaultserviceWormRTGCSRc.switch Usr/lpp/ssp/css/rc.switchUsing the css.snap script Var/adm/SPlogs/css Var/adm/SPlogs/cssX where X=0 orVar/adm/SPlogs/cssX/p0 where X=0 or Css.snap file structureMost recent css.snaps splstdata Most recent css.snaps ifcldumpMost recent css.snaps readregs If the -a and -p flags are not used SP Switch2 supervisor self-testCss.snap file package names Disk space handlingSelf-test Conditions Switch supervisor status verification using PerspectivesOpening a switch pane Checking switch statusBase code verification Updating the SP Switch2 supervisor codeRestoring an SP Switch2 to the active configuration Removing and restoring switch resourcesRemoving an SP Switch2 from the active configuration Fencing nodes Efence of primary and primary backup nodesResetting the clock and bootlist after servicing a node Replacing an SP Switch2 from service positionRunning diagnostics on a switch port Handling static-sensitive devices FRU removals and replacementsReplacing a fan assembly SP Switch2 service proceduresRemoving a fan assembly Replacing a power supply Removing a power supplyReplacing the LED bracket assembly Removing the LED bracket assemblyRemoving the switch supervisor card Removing an interposer card Replacing the switch supervisor cardReplacing an interposer card Removing the switch planarRemoving the 48 V dc circuit breaker assembly Replacing the switch planarRemoving the LED power extension cable Replacing the 48 V dc circuit breaker assemblyReplacing the LED power extension cable Parts catalog SP Switch2 assembly view Assembly Part number Units Description Index 4RS/6000 SP SP Switch2 Service Guide Baffle, Power Supply Bay Tray This page intentionally left blank Switch cablesSwitch cables Front SP Switch2 Frame F/CSP Switch2 Frame F/C 2032 frame extender F/C 2032 frame extender SP Switch2 Frame Model 556 and F/C SP Switch2 Frame Model 556 and F/C Model 556 and F/C 2034 frame extender Model 556 and F/C 2034 frame extender 16RS/6000 SP SP Switch2 Service Guide AIX TrademarksIndustry Canada compliance statement United Kingdom telecommunications safety requirementsEuropean Union EU statement Radio protection for Germany For installations in JapanElectromagnetic interference EMI statement Taiwan 4RS/6000 SP SP Switch2 Service Guide Index Numerics Files Created by css.snap Removing LED bracket 4RS/6000 SP SP Switch2 Service Guide Please tell us how we can improve this book Readers comments ± Wed like to hear from youHow satisfied are you that the information in this book is Business Reply Mail Page Ibmr
Related manuals
Manual 114 pages 42.66 Kb

RS/6000 SP specifications

The IBM RS/6000 SP (Scalable Power) is a high-performance computing system that was developed in the early 1990s and has since become a significant player in the realm of supercomputing and enterprise solutions. Designed primarily for scientific, engineering, and complex data analysis tasks, the RS/6000 SP provides powerful processing capabilities, enhanced scalability, and features to support demanding applications.

One of the key characteristics of the RS/6000 SP is its modular architecture, which allows for the addition of multiple nodes. Each node is based on IBM's Power architecture, leveraging the RISC (Reduced Instruction Set Computing) design to achieve high throughput and efficiency. The system can support configurations ranging from a few nodes to hundreds, enabling organizations to scale their computational power as needed based on workload requirements.

The RS/6000 SP employs advanced interconnect technologies, most notably the SP Switch, which ensures high-speed communication between nodes. This interconnect allows for seamless data transfer, ensuring that the system can handle large datasets and complex computations without bottlenecks. The SP's ability to deliver concurrent processing capabilities makes it ideal for parallel computing tasks, including simulations, modeling, and large-scale computations.

In terms of software, the RS/6000 SP was equipped with AIX, IBM's version of the UNIX operating system, which provides a stable and secure environment for enterprise applications. Furthermore, the system supports a vast array of programming languages and tools, including Fortran, C, and C++, along with libraries and frameworks designed for high-performance computing. This compatibility allows developers to optimize their applications to fully utilize the underlying hardware.

Another notable feature of the RS/6000 SP is its extensive support for various workloads, including database management, multi-user applications, and graphical processing. The system was equipped with high-performance graphics capabilities, making it suitable for tasks that require intensive visualization, such as computer-aided design (CAD) and scientific visualization.

Overall, the IBM RS/6000 SP has solidified its role in the high-performance computing landscape, combining advanced technologies, robust scalability, and flexibility to meet the unique demands of research and enterprise environments. Its legacy continues to influence modern computing architectures, embodying IBM’s commitment to innovation and performance in the pursuit of complex problem-solving capabilities.