5. Schedule the installation of electrical wiring and outlets.
6. Ensure that required host system updates are installed.
7.Begin installing and testing the Advanced Function Presentation lice programs and updates on the host system.
Step Three–Review Progress of Site Preparation
1.Review
2. Ensure that the electrical wiring and outlets are being installe
3.Ensure that the attachment lines and equipment is being installed schedule.
Step Four–Ensure that Site Preparation is Complete
1.Ensure that installation and testing of electrical wiring and out complete.
2. Ensure that all site preparation activity is complete.
3.Gather information for the configuration work sheets in Chapter 5 “Configuring the 3130” on page 25 and schedule an NCP Generation needed.
| Important |
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
| |||
Before | the | customer | engineer can install | the | 3130, | you | must |
|
|
| |||
complete | a configuration worksheet for the attachment | you | plan | to |
|
|
| ||||||
use . | Completing the attachment worksheets usually requires input | ||||||||||||
the | personnel | responsible for | network | and | device driver | configu | |||||||
For detailed worksheets, instructions, and examples,IBM | refer to | ||||||||||||
InfoPrint 60; 3130, 3160, and 3935 Advanced Function Printer: | |||||||||||||
Attachment Configuration Handbook, | If | you do not have a | |||||||||||
copy | of | the | handbook, ask | your marketing | representative | to obt | |||||||
for you. Information is also available on the Internet at | |||||||||||||
http://can.ibm.com/ibmprinters. |
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Step Five–Arrival of the 3130
1. Contact the customer engineer and arrange to have the 3130 in
2. Arrange to have the 3130 attached to the host system.
3.Complete tests of the Advanced Function Presentation licensed pro including the
Additional Planning Tasks
Here are some other issues to consider before you install the 313
ŸTraining. Who will need training on the 3130 and AFP? Who will conduct
training sessions? When will training be scheduled?
ŸImplementation. How will the 3130 be phased into production? Which applications will use the 3130 first?
Chapter 2. Planning Overview11