Chapter 3: Installation
Pre-Installation Considerations
Full-Duplex Considerations
The Switch provides
1000BASE-T Cable Requirements
All Category 5 UTP cables that are used for
5.Therefore, the first step in preparing existing Category 5 cabling for running
Positioning the Switch
Before you choose a location for the Switch, observe the following guidelines:
•Make sure that the Switch is accessible and that the cables can be connected easily.
•Keep cabling away from sources of electrical noise, power lines, and fluorescent lighting fixtures.
•Position the Switch away from water and moisture sources.
•To ensure adequate air flow around the Switch, be sure to provide a minimum clearance of two inches (50mm).
•Do not stack