Cisco Systems 3000 Series manual Installing the Switch Module in the Blade Enclosure

Page 10

Consider these prerequisites before you install the switch module:

Fill any unoccupied interconnect bays or any unoccupied power module bays in the blade enclosure with blanks.

Identify the bays in which you will insert the switch modules. Plan to install the first switch module in bay 1, the second in bay 2, and so on up to bay 8, if possible. The bay in which you choose to install each switch module depends on whether mezzanine or Ethernet cards are installed in the blade enclosure and how they are configured. See the blade enclosure documentation information about installing and configuring the mezzanine or Ethernet cards.

The interconnect module bays are physically interconnected in pairs through the blade enclosure backplane. That is, each of these pairs—bays 1 and 2, bays 3 and 4, bays 5 and 6, and bays 7 and 8—are interconnected. If you install two switch modules in one of the paired bays, they are internally interconnected. You must configure the switch modules to logically enable the interconnect ports, Gigabit Ethernet ports 23 and 24. See the switch module software configuration guide for information on configuring these ports.

See the HP c-Class documentation for information on the port mapping between blade enclosures and the switch modules.

4Installing the Switch Module in the Blade Enclosure

Before you install the switch module in the blade enclosure, consider these points:

Review and become familiar with the safety guidelines in the Regulatory Compliance and Safety Information for the Cisco Catalyst Blade Switch 3000 Series for HP that accompanies this guide.

Review and become familiar with the safety guidelines in the HP BladeSystem enclosure setup and installation guide.

Review and become familiar with the temperature, power, and grounding requirements specified in the HP BladeSystem enclosure setup and installation guide.

Warning

Only trained and qualified personnel should be allowed to install, replace, or service

 

this equipment. Statement 1030

 

 

Caution To prevent electrostatic-discharge (ESD) damage when installing switch modules, follow your normal board and component handling procedures.

Note When you install a switch module, you do not need to power down the blade enclosure.

10

Image 10
Contents Getting Started Guide About This Guide Shipping Box Contents Taking Out What You NeedCisco Switch Module Descriptions Cisco Catalyst Blade Switch 3120 for HPUID 1 LED Cisco Catalyst Blade Switch 3020 for HP Catalyst Blade Switch 3020 for HP 100BASE-T HP Blade System Architecture Rear View of the Blade EnclosureInstalling the Switch Module in the Blade Enclosure Lever for the interconnect module blank Switch module release latch Page Page Page Using Express Setup Advanced Settings Tab Enter enable Managing the Switch Module Using the Device ManagerPage Using the Command-Line Interface Using the Onboard Administrator CLI Other Management Options Page Stack Cabling Configurations Connecting the StackWise Plus CablesConnecting to the Switch Module Ports Connect to 10/100/1000 Ports250299 Case of Difficulty Resetting the Switch ModuleVerify Port Connectivity Accessing Help Online For More InformationObtaining Documentation and Submitting a Service Request USA