Cisco Systems MAS-7K, MAS-7507, CHAS-7507, CHAS-7K manual Verifying the Installation

Page 25

Verifying the Installation

Step 2 After turning on the lower power supply, turn ON the upper power supply (if one is present) for redundant power. The upper power LED on the front of the chassis will go on.

Step 3 While the system initializes, the boot error LED on the RP (or the CPU halt LED on the RSP2 and RP) goes on for about five seconds or less, then goes out when the boot is complete. The interface processor LEDs also go on in irregular sequence as the RP (or RSP2) initializes each one.

Step 4 After the system boots the software and initializes the interface processors (approximately

30 seconds), verify that the RP (or RSP2) LEDs are in the following states:

Normal LED is on

CPU halt LED is off (on the RSP2 and RP)

Boot error LED is off (on the RP)

Step 5 Verify that all of the enabled LEDs on all interface processors (and on the SP or SSP in the Cisco 7000) are on.

Step 6 Verify that the console terminal displays a script and system banner.

When you have verified all of the conditions in Steps 1 through 6, the replacement procedure is complete, and you can now resume normal operation.

An error condition exists if no indicators go on at power up or after initialization, or if the boot error or CPU halt LEDs go on and remain on. If this happens, proceed to the section “Troubleshooting the Installation” to isolate the problem.

Cisco 7000 and Cisco 7507 Chassis Replacement Instructions 25

Image 25
Contents Cisco 7000 and Cisco Chassis Replacement Instructions Cisco 7000 Chassis Rear View Product OverviewCisco 7507 Chassis Rear View Power Supply Safety Interlocks Cisco 7507 System Backplane Slot Key Guides Prerequisites Safety Guidelines Lifting the Chassis Safely Cable Strain Relief Safety with ElectricityPreventing Electrostatic Discharge Damage List of Parts and ToolsReplacing a Rack-Mounted Chassis Unpacking the ChassisPreparing the Work Area Replacing a Rack-Mounted Chassis Adding a New Chassis to the Rack Replacing the Existing Rack-Mounted Chassis Replacing a Rack-Mounted Chassis Rack Mounting Hardware Replacing a Rack-Mounted Chassis Moving the Processor Modules Moving System ComponentsBottom Ejector Lever and Captive Installation Screw Handling a Processor Module During Installation Moving Power Supplies Handling a Power Supply AC-Input Power Supply Shown DC-Input Power Supply Cable Connections Checking Connections Verifying the InstallationRestarting the System Verifying the Installation LED Descriptions Troubleshooting the InstallationOUT Inputfail Power System Front Panel LEDs Normal Normal Eject Interface Processor, SP, and SSP LEDs Verifying the Installation Verifying the Installation Chassis serial number Slot Circle one RSP2 Power Disconnection Warning Translated Safety WarningsPower Supply Warning Power Supply Disconnection Warning Electric Shock Warning Chassis Lifting Warning DC Power Disconnection Warning Lightning Activity Warning Chassis Warning-Rack-Mounting and Servicing Translated Safety Warnings Ramp Warning DC Power Supply WarningDC Power Supply Wiring Warning DC Power Connection Warning Translated Safety Warnings Cisco Information Online