Cisco Systems UBR7225VXR quick start Cabling, Connecting Interface Card Cables

Page 15

1

Power switch

3

AC-input receptacle

 

 

 

 

2

Handle

4

Captive installation screw

 

 

 

 

Step 2 Plug the power cable into the AC connector of the power supply.

Note For additional AC power cable strain relief, secure the cable to the power supply handle by inserting a nylon cable tie through the hole in the handle and around the cable.

Step 3 Plug the AC power supply cable into the AC power source. Repeat Step 1 through Step 3 for the second power supply, if required.

Step 4 Turn on the power switch on the router.

6Cabling

This section contains information about connecting interface card cables, auxiliary, and console ports.

Connecting Interface Card Cables

The instructions for connecting the cables for each cable interface line card installed in the Cisco uBR7225 router are contained in the cable interface card installation document. Refer to the Cisco uBR7200 Series Cable Interface Line Card Hardware Installation Guide at the following URL:

http://www.cisco.com/en/US/products/hw/cable/ps2217/prod_installation_guides_list.html

Console and Auxiliary Port Connection Equipment

The console port is a DCE DB-25 receptacle for connecting a data terminal, which you use to configure the interfaces and bring up the Cisco uBR7255VXR router. The auxiliary port is a DTE DB-25 plug for connecting a modem or the other DCE device (such as a channel service unit/data service unit) to the router.

Note Both the console and auxiliary ports are asynchronous serial ports; any devices connected to these ports must be capable of asynchronous transmission.

Before connecting a terminal to the console port, configure the terminal to match the router console port as follows:

9600 baud

8 data bits

No parity

1 stop bit (9600 8N1)

For details about cabling, refer to the Cisco uBR 7200 Series Universal Broadband Router Hardware Installation Guide at the following URL:

http://www.cisco.com/en/US/products/hw/cable/ps2217/prod_installation_guides_list.html

15

Image 15
Contents Cisco uBR7225VXR Universal Broadband Router OverviewCisco uBR7225VXR Components Cable interface card slot Site Environment Preparing for InstallationCard Slot and Logical Interface Numbering Site PreparationVerifying Contents After Unpacking Cabling Guidelines Installation GuidelinesInstallation Tools and Equipment Power GuidelinesCoaxial Cable Connections Workbench and Tabletop Installation GuidelinesInstalling the Chassis Rack-Mount Installation GuidelinesAttaching the Rack-Mount Brackets Attach the Rack-Mount Brackets to the Front of the Chassis Attach the Rack-Mount Brackets to the Rear of the ChassisAttach the Rack-Mount Brackets to the Middle of the Chassis Installing the Chassis on a Workbench or Tabletop Installing the Cable-Management BracketInstalling the Chassis in the Rack Ground Lug Location Connecting the Chassis to GroundAC Power Supplies Connecting the Chassis to PowerConnecting Interface Card Cables CablingConsole and Auxiliary Port Connection Equipment Troubleshooting the Installation Powering on the Cisco uBR7225VXR RouterIdentify Startup Problems Other Troubleshooting Information WebsitesRelated Documentation Obtaining Documentation and Submitting a Service Request
Related manuals
Manual 184 pages 62.36 Kb