Cisco Systems UBR7225VXR quick start Installing the Chassis, Rack-Mount Installation Guidelines

Page 8

Rack-Mount Installation Guidelines

Allow sufficient clearance around the rack for maintenance.You need 36 in. (91.44 cm) of clearance to remove and replace system components.

Always place the heavier equipment in the lower half of the rack.

If the rack is provided with stabilizing devices, install the stabilizers before mounting the chassis.

Make sure that open or relay racks are bolted to the floor.

When mounting the chassis in four-post or relay racks, use all the screws and brackets that are provided.

4Installing the Chassis

The Cisco uBR7225VXR routers may be installed on a tabletop or rack-mounted. A rack-mount kit ships from the factory with each router. The rack-mount kit includes the hardware used to mount the router in a standard 19-inch equipment rack or Telco-type rack.

Attaching the Rack-Mount Brackets

Before installing the chassis in the rack, you must install rack-mount brackets on each side of the front, middle, or rear of the chassis. (See Figure 4.) You can use the cable-management bracket if you are rack-mounting the chassis from the front. If you are rack-mounting the chassis at the rear or middle of the chassis, both rack-mount brackets and the cable-management bracket must be installed on the chassis before the chassis is installed in the rack.

Figure 4 Rack-Mount Bracket Options

1

2

270628

4

3

8

Image 8
Contents Overview Cisco uBR7225VXR Universal Broadband RouterCisco uBR7225VXR Components Cable interface card slot Preparing for Installation Card Slot and Logical Interface NumberingSite Preparation Site EnvironmentVerifying Contents After Unpacking Installation Guidelines Installation Tools and EquipmentPower Guidelines Cabling GuidelinesWorkbench and Tabletop Installation Guidelines Coaxial Cable ConnectionsAttaching the Rack-Mount Brackets Installing the ChassisRack-Mount Installation Guidelines Attach the Rack-Mount Brackets to the Rear of the Chassis Attach the Rack-Mount Brackets to the Front of the ChassisAttach the Rack-Mount Brackets to the Middle of the Chassis Installing the Cable-Management Bracket Installing the Chassis on a Workbench or TabletopInstalling the Chassis in the Rack Connecting the Chassis to Ground Ground Lug LocationConnecting the Chassis to Power AC Power SuppliesConsole and Auxiliary Port Connection Equipment Connecting Interface Card CablesCabling Powering on the Cisco uBR7225VXR Router Troubleshooting the InstallationRelated Documentation Identify Startup ProblemsOther Troubleshooting Information Websites Obtaining Documentation and Submitting a Service Request
Related manuals
Manual 184 pages 62.36 Kb