Cisco Systems UBR7225VXR quick start Verifying Contents After Unpacking

Page 5

Temperature and Humidity Requirements

Table 1 and Table 2 list the nominal operating and non-operating environment requirements. Any measurements that approach the minimum or maximum of a range indicate a potential problem.

Table 1

Operating Environment

 

 

 

 

 

Specification

Minimum

Maximum

 

 

 

Temperature, ambient operating

32°F (0°C)

104°F (40°C)

 

 

 

Humidity, ambient (non-condensing) operating

10%

90%

 

 

 

Altitude, operating and non-operating

–197 ft (–60 m)

13,123 ft (4000 m)

 

 

 

Vibration, operating

5 to 200 Hz, 0.5 g (1 octet/min.)

 

 

 

 

Table 2

Non-operating Environment

 

 

 

 

 

Specification

Minimum

Maximum

 

 

 

Temperature, ambient non-operating and storage

–4°F (–20°C)

149°F (65°C)

 

 

 

Humidity, ambient (non-condensing) non-operating and storage

5%

95%

 

 

 

Altitude, operating and non-operating

–197 ft (–60 m)

13,123 ft (4000 m)

 

 

 

Vibration, non-operating

5 to 200 Hz, 1 g (1 octet/min.)

 

 

 

200 to 500 Hz, 2 g (1 octet/min.)

 

 

 

 

Verifying Contents After Unpacking

Power cables, manuals, and other additional items are packaged in separate boxes. After you have unpacked the system, verify that you have received all the required components and documentation.

Step 1 Using the packing list as a guide, verify that you have received everything that is listed, including the following:

a.System hardware documentation and software documentation (if ordered).

b.Optional equipment that you ordered, such as transceivers (GBICs), flash cards, cables, or special connectors.

Step 2 Check that all equipment you ordered is installed in the chassis.

Step 3 Ensure that the system configuration matches the packing list.

5

Image 5
Contents Cisco uBR7225VXR Universal Broadband Router OverviewCisco uBR7225VXR Components Cable interface card slot Card Slot and Logical Interface Numbering Preparing for InstallationSite Preparation Site EnvironmentVerifying Contents After Unpacking Installation Tools and Equipment Installation GuidelinesPower Guidelines Cabling GuidelinesCoaxial Cable Connections Workbench and Tabletop Installation GuidelinesAttaching the Rack-Mount Brackets Installing the ChassisRack-Mount Installation Guidelines Attach the Rack-Mount Brackets to the Front of the Chassis Attach the Rack-Mount Brackets to the Rear of the ChassisAttach the Rack-Mount Brackets to the Middle of the Chassis Installing the Chassis on a Workbench or Tabletop Installing the Cable-Management BracketInstalling the Chassis in the Rack Ground Lug Location Connecting the Chassis to GroundAC Power Supplies Connecting the Chassis to PowerConsole and Auxiliary Port Connection Equipment Connecting Interface Card CablesCabling Troubleshooting the Installation Powering on the Cisco uBR7225VXR RouterRelated Documentation Identify Startup ProblemsOther Troubleshooting Information Websites Obtaining Documentation and Submitting a Service Request
Related manuals
Manual 184 pages 62.36 Kb