Brocade Communications Systems manual Inserting a SilkWorm 4016 into the Chassis

Page 26

2

Inserting a SilkWorm 4016 into the Chassis

Refer to the SFP manufacturer’s documentation for details about SFP modules.

After it is activated, the switch runs self-diagnostic tests such as POST. For more information, see “Interpreting POST Results” on page 4-3. After the diagnostics are complete, cable the SilkWorm 4016 as directed by the blade server chassis manufacturer’s documentation. The blade server creates a connection to the switch for configuration.

See Chapter 3, “Configuring the Brocade SilkWorm 4016” for instructions on setting the initial IP address for the switch module.

2-4

SilkWorm 4016 Hardware Reference Manual

Publication Number: 53-1000175-01

Image 26
Contents SilkWorm Brocade Communications Systems, Incorporated Document History Page Contents Chapter Installing the Brocade SilkWorm Index Publication Number About This Document How This Document Is OrganizedDocument Conventions Supported Hardware and SoftwareWhat’s New in This Document Text FormattingBrocade Resources Fabric OS Optional FeaturesAdditional Information Fabric OSOptional Brocade Features Other Industry ResourcesGetting Technical Help General InformationDocument Feedback Documentation@brocade.comSilkWorm 4016 Features Introducing the SilkWormSilkWorm 4016 Features Memory Switch CharacteristicsWeight and Physical Dimensions Additional Port ActivationPort Side 1Port Side of the SilkWormNonport Side LabelingSFPs 4Insertion Arm Label# Active Ports External Port # Trunking groups Brocade Optional FeaturesISL Trunking Groups Brocade Optional Features To remove the SilkWorm 4016 from its shipping package Installing the Brocade SilkWormUnpacking the SilkWorm To insert the SilkWorm 4016 into a blade server chassis Preparing the Blade Server for the SilkWormInserting a SilkWorm 4016 into the Chassis Inserting a SilkWorm 4016 into the Chassis Inserting a SilkWorm 4016 into the Chassis Items Required Configuring the Brocade SilkWormConfiguring the SilkWorm Creating a Serial Connection Creating an Ethernet Connection Connecting to the SwitchSetting the Switch IP Address Completing the Switch Configuration To complete the switch configurationConfiguring the SilkWorm Activating Ports on Demand POD Activating Ports with a POD LicenseRemoving POD-licensed Ports Connecting to the Switch Using Web ToolsTo connect to the switch using Brocade’s Web Tools Connecting to the Switch Using Web Tools Interoperability Switch Minimum VersionOperating the Brocade SilkWorm Operating System Support Accessing the SilkWormPort Negotiation Operating System VersionInterpreting Post Results To determine Post completion statusLocation Indicator Color Operation Interpreting LED ActivityRemoving and Replacing the SilkWorm To remove a failed or replaced SilkWormSqueeze the release lever latch to release the SilkWorm Scale 1/8 = Removing and Replacing the SilkWorm Facility Requirements Brocade SilkWorm 4016 SpecificationsWeight and Physical Dimensions Table A-2Table A-3 Architectural SpecificationSupported HBAs FCC Warning US only Fibre Channel Standards ComplianceRegulatory Compliance MIC Statement Republic of KoreaVcci Statement Bsmi Statement ChineseCanadian Requirements RTC BatteryCE Statement Laser ComplianceRegulatory Certifications Electrical SafetyCountry Safety Specification EMC Specification Regulatory Compliance 3EMC Certifications Regulatory Compliance Index LED 1-2,4-3,4-4,4-5 Weight 1-3,A-1 Index-4