Pelco NSM5200 manual Connections, Connecting Power

Page 21

Connections

Familiarize yourself with the NSM5200 rear panel before connecting any equipment to the unit.

Figure 16. Rear Panel Layout

ì

î

ï

ñ

ó

r s

Power Supply Connectors (hot-swappable)

Power Supplies (hot-swappable)

Power Supply LEDs (status)

Mute button

Fibre Channel Connector

Mini-SAS Connector

Ethernet Port 2 (reserved for future use)

t u ~í ~â ~ä ~ã ~å

Ethernet Port 1

VGA Port

Serial Port

USB 2.0 Ports (2)

Connector for Keyboard (purple)

Connector for Mouse (green)

Power Supply (reserved for future use)

CONNECTING POWER

The NSM5200 is equipped with two hot-swappable power supplies. These autoranging power supplies adapt automatically to voltages from

100to 240 VAC (50/60 Hz). You should also install an uninterruptible power supply (UPS), which is not supplied. UPS devices maintain a limited amount of backup battery power if the main power fails. Refer to Appendix B: Installing an Uninterruptible Power Supply (UPS) on page 30 for more information.

NOTE: Connect each power supply to a different branch circuit. This ensures optimal performance, reduces possible video loss, and reduces power leakage to a safe level.

To connect the power supplies:

1.Connect each power cord to a power supply connector.

2.Connect the other end of each power cord to the appropriate power source.

When connected, the power supply status indicators glow solid red. As soon as the unit starts, the indicators glow solid green. During operation, if either indicator is not lit or glows red, there is a problem with a power supply.

C3683M (3/09)

21

Image 21
Contents Endura NSM5200 Series Page Contents List of Tables List of IllustrationsVideo Quality Caution Regulatory NoticesDescription Fully Compatible with Endura FeaturesOptional Accessories ModelsModel Storage Country Code Parts List Before You BeginQty Description USER-SUPPLIED Parts Package ContentsRack Mount Kit Product Serial Number Labels Product Serial Number Label PlacementDesktop Installation Equipment Placement and Rack MountingRack Mounting To install the NSM5200 in a rackAssembling a Support Rail Repeat for the other rail set Rack Front Attaching Rack Rail Spacers Repeat for the second spacer Tighten the two screws to secure the spacer to the rack Thumbscrew Installing Hard Drive Carriers Hard Drive Array InstallationC3683M 3/09 Connections Connecting PowerNetwork Cable Connection Connecting to the NetworkOperation Front Panel Controls and IndicatorsNetwork Port 1 Speed and Activity Software StatusNetwork Port 2 Speed and Activity Unit StatusUnit Shutdown Unit StartupTroubleshooting Power SuppliesProblem Possible Causes Suggested Remedy Power Blue Pelco badge Software Status SpecificationsInterface Auxiliary Interfaces USBConstruction Steel cabinet Finish Front bezel PhysicalAppendices Appendix a Expanding Video StorageYou do not have to shut down the NSM5200 to add a DAS5200 Connecting a UPS to an NSM5200 Appendix B Installing AN Uninterruptible Power Supply UPSProduct Warranty and Return Information
Related manuals
Manual 12 pages 55.5 Kb