Paradyne 8300 installation instructions Package Checklist, Preparation

Page 2

Package Checklist

Verify that your package contains the following:

8300 Endpoint

Power cord

8-pin modular cable for connection to the DSL network

Ferrite choke for the Ethernet cable

A DB9-to-DB9 cable for connection to an asynchronous terminal or PC (personal computer) is included with some models.

Preparation

Make sure you have:

A dedicated, grounded power outlet that is protected by a circuit breaker within 6 feet of the 8300 Endpoint

A clean, well-lit, and ventilated site that is free from environmental extremes

One to two feet of clearance for cable connections

An asynchronous terminal or PC

A physical connection to the G.shdsl line

A physical connection to an Ethernet LAN, if used, and an 8-pin modular cable

A physical connection to a router, if used, and an appropriate shielded serial cable

A physical connection to a PBX, if used, and an RJ48C modular cable

For additional information, see the 8300 User’s Guide.

Before you install the unit, please refer to the Important Safety Instructions on page 12. Be sure to register your warranty at www.paradyne.com/warranty.

2

Image 2
Contents Contents Product Documentation OnlinePackage Checklist PreparationInstalling the Power Cord ProcedureFront Panel LEDs and Switches Indicator DescriptionConnecting the Supervisory Port Connecting the Ethernet Port Connecting the Serial PortConnecting the CBR Port Connecting the Network PortWeb Interface Accessing the Web Interface United States EMI Notice Canada EMI Notice Important Safety Instructions Warranty, Sales, Service, and Training Information Supplier’s Declaration of ConformityDocument Feedback TrademarksPage 8300-A2-GN10-00