Package Checklist
Verify that your package contains the following:
❑8300 Endpoint
❑Power cord
❑
❑Ferrite choke for the Ethernet cable
A
Preparation
Make sure you have:
❑A dedicated, grounded power outlet that is protected by a circuit breaker within 6 feet of the 8300 Endpoint
❑A clean,
❑One to two feet of clearance for cable connections
❑An asynchronous terminal or PC
❑A physical connection to the G.shdsl line
❑A physical connection to an Ethernet LAN, if used, and an
❑A physical connection to a router, if used, and an appropriate shielded serial cable
❑A physical connection to a PBX, if used, and an RJ48C modular cable
For additional information, see the 8300 User’s Guide.
Before you install the unit, please refer to the Important Safety Instructions on page 12. Be sure to register your warranty at www.paradyne.com/warranty.
2