Installing the Power Cord

The POWER port on the unit is a standard, grounded, three-prong connector. The unit has no power switch.

Figure 1. Hotwire 8300 Endpoint Back Panel

Procedure

1.Insert the power cord’s receptacle into the POWER jack.

2.Plug the other end of the power cord into a grounded power outlet.

3.Check the LEDs.

When power is applied to the unit, the front panel indicators flash for approximately 10 to 15 seconds as the unit initializes itself. The green POWER LED on the front panel remains on as long as the unit receives power. If the indicator does not light up, check the power connections and the primary circuit breaker.

Figure 2. Hotwire 8300 Endpoint Front Panel

3

Image 3
Contents Product Documentation Online ContentsPreparation Package ChecklistProcedure Installing the Power CordIndicator Description Front Panel LEDs and SwitchesConnecting the Supervisory Port Connecting the Serial Port Connecting the Ethernet PortConnecting the Network Port Connecting the CBR PortWeb Interface Accessing the Web Interface United States EMI Notice Canada EMI Notice Important Safety Instructions Supplier’s Declaration of Conformity Warranty, Sales, Service, and Training InformationTrademarks Document FeedbackPage 8300-A2-GN10-00