Patton electronic 2884 Planning the installation, Site log, Network information, Network Diagram

Page 24

IpLink 2884/2888 Getting Started Guide

3 • IpLink installation

 

 

Planning the installation

Before installing the gateway router device, the following tasks should be completed:

Create a network diagram (see section “Network information” on page 24)

Gather IP related information (see section “IP related information” on page 25 for more information)

Install the hardware and software needed to configure the IpLink. (See section “Software tools” on page 25)

Verify power source reliability (see section “Power source” on page 25).

After you have finished preparing for gateway router installation, go to section “Installing the IpLink 2884/2888” on page 25 to install the device.

Site log

Patton recommends that you maintain a site log to record all actions relevant to the system, if you do not already keep such a log. Site log entries should include information such as listed in table 5.

 

Table 5. Sample site log entries

 

 

Entry

Description

 

 

Installation

Make a copy of the installation checklist and insert it into the site log

 

 

Upgrades and maintenance

Use the site log to record ongoing maintenance and expansion history

 

 

Configuration changes

Record all changes and the reasons for them

 

 

Maintenance

Schedules, requirements, and procedures performed

 

 

Comments

Notes, and problems

 

 

Software

Changes and updates to software

 

 

Network information

Network connection considerations that you should take into account for planning are provided for several types of network interfaces are described in the following sections.

Network Diagram

Draw a network overview diagram that displays all neighboring IP nodes, connected elements and telephony components.

Planning the installation

24

Image 24
Contents IpLink Mailsupport@patton.com Summary Table of Contents Table of Contents Initial configuration Cabling List of Figures List of Tables About this guide AudienceStructure Precautions Safety when working with electricityTypographical conventions used in this document General observationsGeneral conventions Node Chapter contents General informationIpLink Model 2884 Overview IpLink ModelIpLink Model 2888 Overview Features and Benefits Model 2884 FeaturesModel 2888 Features Rear and Front Panels IpLink 2884/2888 rear panelLAN ETH IpLink 2884/2888 front panel LEDApplications overview Typical IPLink 2884 Application Typical application for IPLink ModelTypical IPLink 2888 Application IpLink installation Planning the installation Network DiagramSite log Network informationInstalling the IpLink 2884/2888 Installing cables Connect the cables in the following orderConnecting the power supply Connecting DC Power to the 288x DC Power Supply Initial configuration Connecting the IpLink to your PC Connecting and logging in via the Ethernet portIntroduction Connecting and logging in via the Console port Factory-default IP settingsConfiguring the desired IP address Connecting the IpLink to the network LoginChanging the IP address Contacting Patton for assistance Warranty coverage Contact informationPatton support headquarters in the USA Out-of-warranty service RMA numbersAppendix a Compliance information Safety ComplianceRadio and TV Interference FCC Part 68 Acta StatementIndustry Canada Notice CE Declaration of ConformityAuthorized European Representative Appendix B Specifications WAN Ports Ethernet PortsManagement ProtocolsPower Supply SecurityPhysical Appendix C Cabling Connecting a serial terminal ConsoleEthernet Connecting an E1 port to an NT1 E1 PortConnecting a T1 port to an NT device T1 PortAppendix D Port pin-outs Console port EIA-561 RJ-45 8-pin portT1/E1 port Appendix E End user license agreement End User License Agreement Termination Other licenses
Related manuals
Manual 51 pages 18.45 Kb