TP-Link TL-SL5428E manual 4444Verify Installation, 4444Power On

Page 19

L2 Managed Switch

FFFFFFFFFFFFConnecting the Console Port

You can also manage the device through the console port, for details please refer to the CLI Reference Guide on the resource CD.

Note:

The console port is the first port on the left of the front panel.

Please keep the device power off when plugging the console cable. Do not connect the console port with other ports by RJ45 cable.

4444Verify Installation

After completing the installation, please verify the following items:

There are 5~10cm of clearance around the sides of the device for ventilation and the air flow is adequate.

The voltage of the power supply meets the requirement of the input voltage of the device.

The power socket, device and rack are well grounded.

The device is correctly connected to other network devices.

4444Power On

Plug the female connector of the provided power cord into the power socket of the device, and the male connector into a power outlet as the following figure shown.

FFFFFFFFFFFFConnecting to Power Supply

Connection 14

Image 19
Contents Installation Guide Copyright & Trademarks FCC Statement Related Document Audience Contents Front Panel CCCCCCCCCCCIntroductionProduct Overview Appearance10/100Mbps Port Rear PanelPower Socket Package Contents CCCCCCCCCCCInstallation2222Safety Precautions Electromagnetic Interference ClearnessLightening Protection Desktop Installation 2222Installation Tools2222Product Installation Installation SiteRack Installation Requirements for Cabling Indoors CCCCCCCCCCCLightning ProtectionCabling Reasonably Requirements for Cabling OutdoorsEthernet Cable Connecting to the Ground via the Power Supply Connecting to the Grounding Bar3333Connect to Ground 3333Equipotential Bonding 3333Use Lightning Arrester 4444Console Port CCCCCCCCCCCConnectionEthernet Port 4444SFP Port4444Power On 4444Verify Installation4444Initialization Configure the Switch via GUI CCCCCCCCCCCConfigurationLogon by a Console Port 5555Configure the Switch Using CLISelect the port to connect in -6, and click OK Logon by Telnet Type cmd in the prompt Run window as -10 and click OK FFFFFFFFFFFFFLog in the Switch Qqqq Why does the Power LED work abnormally? AAAAAAAAAAAATroubleshootingAAAAAAAAAAAAHardware Specifications Tplink AAAAAAAAAAAATechnical SupportPage Page Tel +86 755 Mail support@tp-link.com 7106503651 Rev
Related manuals
Manual 259 pages 46.72 Kb