L2 Managed Switch
Note: The figure is to illustrate the application and principle. The power cord you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the figure above.
4444Initialization
After the device is powered on, it begins the
■■ The PWR LED indicator will light on all the time.
■■ After keeping off for several seconds, the LED indicators of all the ports will flash momentarily and then turn off again after the initialization.
■■ The SYS LED indicator will flash, which represents a successful initialization.
15 Connection