TP-Link TL-SL5428E manual 2222Installation Tools, 2222Product Installation, Installation Site

Page 11

L2 Managed Switch

protection measures should be taken.

Ensure the rack and device are well earthed.

Make sure the power socket has a good contact with the ground. Keep a reasonable cabling system and avoid induced lightning.

Use the signal SPD (Surge Protective Device) when wiring outdoor.

Note: For detailed lightning protection measures, please refer to Chapter 3

Lightning Protection.

Installation Site

S

When installing the device on a rack or a flat workbench, please note the following items:

The rack or workbench is flat and stable, and sturdy enough to support the weight of 5.5kg at least.

The rack or workbench has a good ventilation system. The equipment room is well ventilated.

The rack is well grounded. Keep the power socket less than 1.5 meters away from the device.

2222Installation Tools

Phillips screwdriver

ESD-preventive wrist wrap Cables

Note: These tools are not provided with our product. If needed, please self purchase them.

2222Product Installation

Desktop Installation

To install the device on the desktop, please follow the steps below:

111 Set the device on a flat surface strong enough to support the entire weight of the device with all fittings.

222Remove the adhesive backing papers from the rubber feet.

Installation 06

Image 11
Contents Installation Guide Copyright & Trademarks FCC Statement Related Document Audience Contents Front Panel CCCCCCCCCCCIntroductionProduct Overview Appearance10/100Mbps Port Rear PanelPower Socket 2222Safety Precautions CCCCCCCCCCCInstallationPackage Contents Lightening Protection ClearnessElectromagnetic Interference Desktop Installation 2222Installation Tools2222Product Installation Installation SiteRack Installation Requirements for Cabling Indoors CCCCCCCCCCCLightning ProtectionCabling Reasonably Requirements for Cabling OutdoorsEthernet Cable 3333Connect to Ground Connecting to the Grounding BarConnecting to the Ground via the Power Supply 3333Equipotential Bonding 3333Use Lightning Arrester 4444Console Port CCCCCCCCCCCConnectionEthernet Port 4444SFP Port4444Power On 4444Verify Installation4444Initialization Configure the Switch via GUI CCCCCCCCCCCConfigurationLogon by a Console Port 5555Configure the Switch Using CLISelect the port to connect in -6, and click OK Logon by Telnet Type cmd in the prompt Run window as -10 and click OK FFFFFFFFFFFFFLog in the Switch Qqqq Why does the Power LED work abnormally? AAAAAAAAAAAATroubleshootingAAAAAAAAAAAAHardware Specifications Tplink AAAAAAAAAAAATechnical SupportPage Page Tel +86 755 Mail support@tp-link.com 7106503651 Rev
Related manuals
Manual 259 pages 46.72 Kb